Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Apply Date:
12/03/2021
Applicant:
Sunrun Installation Services, Inc
Description:
- SYSTEM SIZE: 6800W DC, 4800W AC- MODULES: (20) HANWHA Q-CELLS: Q.PEAK DUO BLK-G8+ 340- INVERTERS: (20) ENPHASE ENERGY: IQ7-60-2-US- RACKING: SNAPNRACK SERIES UR40; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438
Contractors:
  • Sunrun Installation Services, Inc

Permit Reviews

Permit Number - T21CM09340
Permit Status: Final
Permit Description: - SYSTEM SIZE: 6800W DC, 4800W AC- MODULES: (20) HANWHA Q-CELLS: Q.PEAK DUO BLK-G8+ 340- INVERTERS: (20) ENPHASE ENERGY: IQ7-60-2-US- RACKING: SNAPNRACK SERIES UR40; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438
Start Date Submittal Complete Date Status  
12/03/2021 OTHER 12/29/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T21CM09340
Permit Description: - SYSTEM SIZE: 6800W DC, 4800W AC- MODULES: (20) HANWHA Q-CELLS: Q.PEAK DUO BLK-G8+ 340- INVERTERS: (20) ENPHASE ENERGY: IQ7-60-2-US- RACKING: SNAPNRACK SERIES UR40; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/03/2022 TEP CLEARANCE - PM RCHANDLER Approved CODE DGC
02/03/2022 ELECTRIC - FINAL RCHANDLER Approved AP. DGC clearance for TEP.
02/03/2022 BUILDING - FINAL RCHANDLER Approved AP

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SPEC SHEETS.PDF DOCUMENTS VIEW