Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM09340
Permit Details
Apply Date:
12/03/2021
Applicant:
Sunrun Installation Services, Inc
Description:
- SYSTEM SIZE: 6800W DC, 4800W AC- MODULES: (20) HANWHA Q-CELLS: Q.PEAK DUO BLK-G8+ 340- INVERTERS: (20) ENPHASE ENERGY: IQ7-60-2-US- RACKING: SNAPNRACK SERIES UR40; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438
Contractors:
- Sunrun Installation Services, Inc
Permit Reviews
Permit Number - T21CM09340
Permit Status: Final
Permit Description: - SYSTEM SIZE: 6800W DC, 4800W AC- MODULES: (20) HANWHA Q-CELLS: Q.PEAK DUO BLK-G8+
340- INVERTERS: (20) ENPHASE ENERGY: IQ7-60-2-US- RACKING: SNAPNRACK SERIES UR40; ULTRA RAIL
SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/03/2021 | OTHER | 12/29/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM09340
Permit Description: - SYSTEM SIZE: 6800W DC, 4800W AC- MODULES: (20) HANWHA Q-CELLS: Q.PEAK DUO BLK-G8+
340- INVERTERS: (20) ENPHASE ENERGY: IQ7-60-2-US- RACKING: SNAPNRACK SERIES UR40; ULTRA RAIL
SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/03/2022 | TEP CLEARANCE - PM | RCHANDLER | Approved | CODE DGC |
02/03/2022 | ELECTRIC - FINAL | RCHANDLER | Approved | AP. DGC clearance for TEP. |
02/03/2022 | BUILDING - FINAL | RCHANDLER | Approved | AP |