Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
12/03/2021
Applicant:
Andrea Flood
Description:
SFR F50A19 T19-M0034

Permit Reviews

Permit Number - T21CM09329
Permit Status: Complete
Permit Description: SFR F50A19 T19-M0034
Start Date Submittal Complete Date Status  
02/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/07/2024 APPROVED Review Details

Conditions

Permit Number - T21CM09329
Permit Status: Complete
Permit Description: SFR F50A19 T19-M0034
Date Description Comments
12/03/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/06/2024 Post-Installed Anchor Inspection Report is required.
02/06/2024 Post-Tension Inspection Report is required.
02/07/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/07/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM09329
Permit Description: SFR F50A19 T19-M0034
Total Completed Inspections - 19
Date Description Inspector Results Comments
02/09/2022 COT - RSPL - Sewer Passed {Activity date: 02/09/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
02/17/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 02/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
02/17/2022 COT - RSBU - Preslab Passed {Activity date: 02/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
02/17/2022 COT - RSEL - Electrical Underground Passed {Activity date: 02/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
02/17/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 02/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/07/2022 COT - RSBU - Roof Nailing Passed {Activity date: 04/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/11/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 04/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/07/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO
Relieve all truss mid-bearing points.}
08/15/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 08/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CODE ECO}
08/15/2022 COT - RSPL - Yard Water Line Passed {Activity date: 08/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/09/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval ok to cover no pressure on line
}
08/15/2022 COT - RSEL - Construction Power Passed {Activity date: 08/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP. TEP ECO}
08/18/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 08/15/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA}
08/18/2022 COT - LCBU - Framing Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 08/15/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA per Brandon}
08/31/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 08/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
11/16/2022 COT - RSEL - Outdoor Lighting Passed
11/16/2022 COT - RSPL - Rough Soil Passed
11/16/2022 COT - RSEL - Electrical Final Passed
11/22/2022 COT - RSPL - Plumbing Final Passed SWG clearance required
11/22/2022 RSBU - Building Final Passed
11/22/2022 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION_PT REPORT-2024-02-02_V1.PDF DOCUMENTS VIEW
1_APPLICATION.PDF DOCUMENTS VIEW
1_SITEPLAN.PDF DOCUMENTS VIEW
1_SPECIAL_INSPECTION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW