Permit: T21CM09328
Permit Details
Apply Date:
12/03/2021
Applicant:
Sunrun Installation Services, Inc
Description:
SYSTEM SIZE: 6650W DC, 4560W AC- MODULES: (19) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350- INVERTERS: (19) ENPHASE ENERGY: IQ7-60-2-US- RACKING: SNAPNRACK SERIES UR40; 1-HOLE BASE WITH TILT KIT: SEE UR40-D11- MAIN PANEL REPLACEMENT: EXISTING 200 AMP MAIN PANEL WITH 50 AMP MAIN BREAKER TO BE REPLACED WITH NEW 200 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER WITH 225 AMP BUSBAR
Contractors:
- Sunrun Installation Services, Inc
Permit Reviews
Permit Number - T21CM09328
Permit Status: Final
Permit Description: SYSTEM SIZE: 6650W DC, 4560W AC- MODULES: (19) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350- INVERTERS: (19) ENPHASE ENERGY: IQ7-60-2-US- RACKING: SNAPNRACK SERIES UR40; 1-HOLE BASE WITH
TILT KIT: SEE UR40-D11- MAIN PANEL REPLACEMENT: EXISTING 200 AMP MAIN
PANEL WITH 50 AMP MAIN BREAKER TO BE REPLACED WITH
NEW 200 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER
WITH 225 AMP BUSBAR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/03/2021 | OTHER | 12/29/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM09328
Permit Description: SYSTEM SIZE: 6650W DC, 4560W AC- MODULES: (19) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350- INVERTERS: (19) ENPHASE ENERGY: IQ7-60-2-US- RACKING: SNAPNRACK SERIES UR40; 1-HOLE BASE WITH
TILT KIT: SEE UR40-D11- MAIN PANEL REPLACEMENT: EXISTING 200 AMP MAIN
PANEL WITH 50 AMP MAIN BREAKER TO BE REPLACED WITH
NEW 200 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER
WITH 225 AMP BUSBAR
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2022 | ELECTRIC - SERVICE UPGRADE | ESTEVENS | Approved | Approved. The TEP clearance code is INCR. Called TEP at 1:55 |
| 03/02/2022 | TEP CLEARANCE - PM | WGALLAGHER | Approved | CODE DGC |
| 03/02/2022 | BUILDING - FINAL | WGALLAGHER | Approved | Approved |
| 03/02/2022 | ELECTRIC - FINAL | WGALLAGHER | Approved | Approved ok for clearance DGC |