Permit: T21CM09269
Permit Details
Apply Date:
12/01/2021
Applicant:
ISAAC NORIEGA
Description:
New construction of a fellowship building
Permit Reviews
Permit Number - T21CM09269
Permit Status: Complete
Permit Description: New construction of a fellowship building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2022 | RESUBMITTAL | 04/14/2022 | COMPLETED |
| 04/21/2022 | RESUBMITTAL | 04/27/2022 | COMPLETED |
| 08/18/2022 | REVISION - - 1ST | 09/09/2022 | COMPLETED |
| 12/01/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 02/01/2022 | COMPLETED |
| 06/13/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/27/2023 | REQUIRES RESUBMIT |
| 07/25/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/26/2023 | APPROVED |
| 07/13/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/21/2023 | APPROVED |
Conditions
Permit Number - T21CM09269
Permit Status: Complete
Permit Description: New construction of a fellowship building
| Date | Description | Comments |
|---|---|---|
| 04/22/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 04/22/2022 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 04/22/2022 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 04/22/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 04/22/2022 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 04/22/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 04/22/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 04/15/2022 | SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
| 04/15/2022 | SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
| 04/15/2022 | FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
| 05/03/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 04/15/2022 | FUP T22OT00278 MUST BE PAID BEFORE FINAL INSPECTIONS. | |
| 04/22/2022 | SHOP DRAWINGS REQUIRED FOR TRUSSES | |
| 04/22/2022 | SHOP DRAWINGS REQUIRED FOR SPRINKLERS | |
| 05/03/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM09269
Permite Description: New construction of a fellowship building
Total Outstanding Inspections - 17
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCME - Mechanical Progress | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Underground Flush | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Preslab | N/A | Not Ready | |
| 10/26/2022 | FCON – OH Piping & Hydro | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Building Progress | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Underground Pressure | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Backwater Valve | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Progress | N/A | Not Ready | |
| 10/26/2022 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Electrical Underground | N/A | Not Ready | |
| 10/26/2022 | COT - HCBU - Exterior Clips/Sheathing | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Sewer | N/A | Not Ready | |
| 12/02/2022 | COT - LCPL - Rough Soil | N/A | Partial Pass | future yard water line inspection. |
| 01/19/2023 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | partial pass for Banquet hall #101, kitchen #113, server #114, corridor #110, janitor #111, drinks room #109, serving room #108, lobby #103, okay to cover |
| 07/25/2023 | COT - LCBU - Sustainability | N/A | Not Applicable | |
| COT - FCON - Alarm - Final | N/A | Not Ready | ||
| 07/24/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | everything but alarm is approved |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM09269
Permit Description: New construction of a fellowship building
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2022 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 05/31/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Ground rod system installed. } |
|
| 07/06/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/06/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/31/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, spread and continuous footings ok for concrete placement.} | |
| 08/30/2022 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
| 08/30/2022 | COT - LCBU - Roof Nailing | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
| 10/18/2022 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/04/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Exterior walls only. Ok to insulate} | |
| 10/18/2022 | COT - LCBU - Framing | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/04/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Exterior walls only. Ok to insulate} | |
| 10/18/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/04/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Exterior walls only. Ok to insulate } |
|
| 10/18/2022 | COT - LCME - Mechanical Intermediate | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
| 12/02/2022 | COT - LCPL - Sewer | Passed | okay to backfill. shading required. | |
| 12/14/2022 | COT - HCPL - Yard Water Line | Passed | tracer wire is in and secured. okay to backfill. |
|
| 12/14/2022 | COT - LCPL - Rough Soil | Passed | ||
| 12/22/2022 | BULD - Electrical Clearance | Passed | clearance for TEP ECO. | |
| 01/26/2023 | COT - LCBU - Building Above Ceiling | Passed | ||
| 01/26/2023 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 01/26/2023 | COT - LCEL - Electrical Progress | Passed | ||
| 07/24/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 07/25/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 07/25/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
| 07/27/2023 | COT - LCBU - Building Final | Passed | Recommended for C/O | |
| 07/25/2023 | COT - LCEL - Electrical Final | Passed | ||
| 07/26/2023 | COT - FCON - Alarm - Final | Passed | ||
| 07/26/2023 | COT - FCON - Fire - Final | Passed | ||
| 07/26/2023 | COT - LCME - Mechanical Final | Passed |