Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/26/2021
Applicant:
Scott Feltheim
Description:
Tenant Improvement

Permit Reviews

Permit Number - T21CM09180
Permit Status: Complete
Permit Description: Tenant Improvement
Start Date Submittal Complete Date Status  
06/29/2022 REVISION - - 1ST 07/07/2022 COMPLETED Review Details
08/26/2022 REVISION - - 2ND 08/26/2022 COMPLETED Review Details
11/26/2021 3RD PARTY REVIEW - COMMERCIAL TI 01/11/2022 COMPLETED Review Details
12/29/2022 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/04/2023 APPROVED Review Details

Conditions

Permit Number - T21CM09180
Permit Status: Complete
Permit Description: Tenant Improvement
Date Description Comments
12/27/2021 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
12/27/2021 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM09180
Permit Description: Tenant Improvement
Total Completed Inspections - 17
Date Description Inspector Results Comments
04/28/2022 COT - LCBU - Preslab Passed {Activity date: 04/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
09/13/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 09/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA} ; {Activity date: 09/12/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA}
09/23/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/12/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA northwest corner of MRI room} ; {Activity date: 09/06/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA
3/4” plywood on ceiling and walls in MRI room approved per plan, fasteners and schedule per plan} ; {Activity date: 08/18/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE
Approved plans do not show details for MRI room materials and how to attach. Resubmit new plans for review and field inspection} ; {Activity date: 08/08/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA
1st layer of sheetrock on ceiling of MRI room. Next layer will be plywood.} ; {Activity date: 06/22/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA
All Sheetrock except interior of MRI room approved to tape} ; {Activity date: 06/02/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - partial approval for all areas excluding MRI room ok to tape}
10/03/2022 COT - LCBU - Framing Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP
Exterior west wall, framing for the window reset.} ; {Activity date: 09/30/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA
Infill of west MRI room} ; {Activity date: 09/22/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. Vertical metal studs in MRI room} ; {Activity date: 09/09/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. Framing over sheet metal in shielded area at northwest corner of MRI room.} ; {Activity date: 08/04/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. Hard lid channels in MRI room approved} ; {Activity date: 08/02/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE
Ceiling framing in MRI room not per plan} ; {Activity date: 06/21/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE
The new structural framing details for the MRI ceiling have not been reviewed & approved by Tucson} ; {Activity date: 06/13/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready lack of drawing detail on wall and ceiling buildout on MRI room

} ; {Activity date: 06/10/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR
Approved plans not on site for ceiling framing in MRI room

} ; {Activity date: 06/02/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready} ; {Activity date: 05/20/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA
All rooms except MRI & Control rooms} ; {Activity date: 04/28/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - INSPECTOR TL CHANGED HIS AP FROM 04/28/22 TO PA DUE TO ISSUES FOUND.}
10/06/2022 COT - LCPL - Gas Pressure Test Passed {Activity date: 10/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP
SWG clearance required} ; {Activity date: 10/05/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE
Install a 15 lb gauge with 1/10th increments}
10/06/2022 COT - BULD - SWG Clearance Passed {Activity date: 10/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CODE GAS}
10/10/2022 COT - FCON - Alarm - Final Passed {Activity date: 10/10/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
10/10/2022 COT - FCON - Sprinkler - Final Passed {Activity date: 10/10/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
10/10/2022 COT - FCON - Fire - Final Passed {Activity date: 10/10/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
10/11/2022 COT - LCBU - Building Final Passed {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
10/11/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/22/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. MRI room} ; {Activity date: 05/20/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA
All rooms except MRI & Control rooms}
10/11/2022 COT - LCME - Mechanical Final Passed {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
10/11/2022 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/13/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA
OK to drop ceiling tiles in all area except x-ray room} ; {Activity date: 09/12/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA} ; {Activity date: 08/02/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA MRI room only}
10/11/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/28/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA
Chilled water loop ok to insulate.} ; {Activity date: 05/20/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA
All rooms except MRI & Control rooms}
10/11/2022 COT - LCEL - Electrical Final Passed {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/07/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - PA}
10/11/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
10/11/2022 COT - LCPL - Plumbing Final Passed {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}

Documents

File Name Document Type  
REV1_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PSA 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_REVISION NARRATIVE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
REV1_PSA.PDF DOCUMENTS VIEW
REV1_REVISION NARRATIVE.PDF DOCUMENTS VIEW
REV2_PLAN SET.PDF DOCUMENTS VIEW
REVISION APPLICATION.PDF DOCUMENTS VIEW
RAD-DREXEL SPECIAL INSPECTION CERTIFICATE-2022-12-09_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
REVISION APPLICATION.PDF DOCUMENTS VIEW
REV1_REVISION NARRATIVE.PDF DOCUMENTS VIEW
REV1_PSA.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF CONSTRPLANS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
MECHANICAL COMCHECK.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
REFERENCE SHEETS.PDF DOCUMENTS VIEW
PSA WILLDAN.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW