Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/23/2021
Applicant:
Michael Waters
Description:
two new metal buildings

Permit Reviews

Permit Number - T21CM09130
Permit Status: Complete
Permit Description: two new metal buildings
Start Date Submittal Complete Date Status  
08/02/2022 RESUBMITTAL 08/11/2022 COMPLETED Review Details
09/07/2022 RESUBMITTAL 09/19/2022 COMPLETED Review Details
10/14/2022 RESUBMITTAL 10/17/2022 COMPLETED Review Details
11/23/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 02/01/2022 COMPLETED Review Details
02/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/06/2024 APPROVED Review Details
01/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/25/2024 REQUIRES RESUBMIT Review Details
01/30/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.3 01/30/2024 APPROVED Review Details
01/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/26/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T21CM09130
Permit Status: Complete
Permit Description: two new metal buildings
Date Description Comments
09/16/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
09/16/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
09/16/2022 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
09/16/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
09/16/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/16/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/17/2022 Prior to permit issuance a General Contractor Letter (GCL) is required

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM09130
Permite Description: two new metal buildings
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
01/10/2023 COT - FCON - Underground Pressure N/A Not Applicable
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
COT - FCON - Underground Flush N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/11/2023 FCON – OH Piping & Hydro N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: T21CM09130
Permit Description: two new metal buildings
Total Completed Inspections - 25
Date Description Inspector Results Comments
11/07/2022 COT - LCEL - Electrical Underground Passed
12/20/2022 COT - HCPL - Yard Water Line Passed
01/26/2023 COT - HCEL - Electrical Underground Passed
03/14/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
03/14/2023 COT - LCBU - Building Progress Passed 3-14-23: UG Piping pressure test.
03/15/2023 COT - LCPL - Plumbing Progress Passed New hot & cold supply and return underground tested at 60 psi. OK to cover
New domestic line tested at 98 psi in same trench OK to cover. This is all new chilled and hot lines for the project.
03/16/2023 COT - LCBU - Stem Wall/Retaining Wall Passed
03/22/2023 COT - LCBU - Preslab Passed
03/24/2023 COT - FCON - Underground Flush Passed
04/11/2023 COT - LCBU - Framing Passed
04/11/2023 COT - LCME - Mechanical Final Passed
04/11/2023 COT - LCME - Mechanical Progress Passed
04/11/2023 COT - LCME - Mechanical Intermediate Passed
07/18/2023 COT - LCBU - Building Above Ceiling Passed
07/18/2023 SITE - Zoning Final Passed
07/26/2023 COT - LCEL - Electrical Intermediate Passed
07/26/2023 COT - LCBU - Roof Nailing Passed
07/26/2023 COT - LCBU - Exterior Clips/Sheathing Passed
07/26/2023 COT - LCEL - Electrical Final Passed
08/31/2023 COT - LCEL - Electrical Progress Passed
08/31/2023 COT - LCEL - Outdoor Lighting Passed
11/21/2023 COT - FCON - Alarm - Final Passed
11/21/2023 COT - FCON - Sprinkler - Final Passed
11/21/2023 COT - FCON - Fire - Final Passed
11/22/2023 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
SIC REMOVAL LETTER_V1.PDF DOCUMENTS VIEW
FINAL SPECIAL INSPECTION REPORT T21CM09130-2024-01-30_V5.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEO REPORT.PDF DOCUMENTS VIEW
LIGHTING COMCHECK NORTH BUILDING.PDF DOCUMENTS VIEW
PIMA COUNTY ADDRESSING NORTH BUILDING.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SIC STAMPED.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
STRUC BLDG CALCS.PDF DOCUMENTS VIEW
STRUC FOUNDATION CALCS.PDF DOCUMENTS VIEW