Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL ALTERATION
Apply Date:
11/19/2021
Applicant:
Barker Nestor Inc
Description:
Demo existing exterior stairs/mid-wall/decks and railings on all buildings on property. Construct new exterior stairways (utilizing the same switch back design with intermediate landing). Contractor shall use painted wood framing, columns, landings, 4 X 12 treated stringers, one-piece precast concrete treads and risers (step-stone), composite decking (TREX with proper spacing), pre-finished white aluminum railings that are ADA compliant, and ADA cane railings installed below stairs. Prep, prime and paint all stringers/railings with 2 coats of acrylic paint.
Architects:
  • Kevin Barker
Contractors:
  • BARKER CONSTRUCTION SPECIALTIES, INC.

Permit Reviews

Permit Number - T21CM09042
Permit Status: Final
Permit Description: Demo existing exterior stairs/mid-wall/decks and railings on all buildings on property. Construct new exterior stairways (utilizing the same switch back design with intermediate landing). Contractor shall use painted wood framing, columns, landings, 4 X 12 treated stringers, one-piece precast concrete treads and risers (step-stone), composite decking (TREX with proper spacing), pre-finished white aluminum railings that are ADA compliant, and ADA cane railings installed below stairs. Prep, prime and paint all stringers/railings with 2 coats of acrylic paint.
Start Date Submittal Complete Date Status  
03/03/2022 RESUBMITTAL 03/03/2022 COMPLETED Review Details
11/19/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 12/14/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T21CM09042
Permit Description: Demo existing exterior stairs/mid-wall/decks and railings on all buildings on property. Construct new exterior stairways (utilizing the same switch back design with intermediate landing). Contractor shall use painted wood framing, columns, landings, 4 X 12 treated stringers, one-piece precast concrete treads and risers (step-stone), composite decking (TREX with proper spacing), pre-finished white aluminum railings that are ADA compliant, and ADA cane railings installed below stairs. Prep, prime and paint all stringers/railings with 2 coats of acrylic paint.
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/28/2022 FRAMING RCHANDLER Approved AP 1090
06/28/2022 BUILDING - PROGRESS RCHANDLER Approved AP 1090
06/28/2022 BUILDING - FINAL RCHANDLER Approved AP

Documents

File Name Document Type  
GCL.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW