Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
11/09/2021
Applicant:
Andrea Flood
Description:
SFR F40J19 T19-M0035

Outstanding Activity Conditions

Permit Number - T21CM08793
Permit Status: Issued
Permit Description: SFR F40J19 T19-M0035
Total Outstanding Activity Conditions - 1
Date Name
11/12/2021 ISSUED WITH PCRWRD CONDITIONS:NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD

Completed Inspections

Permit Status: Issued
Permit Number: T21CM08793
Permit Description: SFR F40J19 T19-M0035
Total Completed Inspections - 23
Date Description Inspector Results Comments
02/15/2022 COT - RSPL - Rough Soil Passed {Activity date: 02/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
02/24/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 02/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
02/24/2022 COT - RSBU - Preslab Passed {Activity date: 02/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
02/24/2022 COT - RSEL - Electrical Underground Passed {Activity date: 02/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
02/24/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 02/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/19/2022 COT - RSBU - Roof Nailing Passed {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/31/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - NR}
04/19/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/31/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready missing 2 STHD-10 holddowns per SHT S1.3 AND GLULAMB BEAM SAME LOCATION inspection stopped}
05/10/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 05/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CODE ECO}
05/10/2022 COT - RSEL - Construction Power Passed {Activity date: 05/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP
TEP ECO}
08/17/2022 FCON – OH Piping & Hydro Passed {Activity date: 08/17/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - Approved on 8/1/2022 on T22FC00481}
08/18/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/19/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/18/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE
1. Over notch stud in laundry
2. Over notch stud in shower.
3. Block base of landing.
4. Line-set missing insulation in attic.
5. Repair hole in kitchen shear wall.
6. Fire block top of open chase at garage opening.}
08/19/2022 COT - LCBU - Framing Passed {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/18/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE}
08/19/2022 RSME - Mechanical Progress Passed {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/18/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE}
09/13/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 09/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Missing screws in some areas. Screws in perimeter need to be 3/8 from edge.}
11/07/2022 COT - RSPL - Plumbing Final Passed SWG clearance required
11/14/2022 COT - RSME - Mechanical Final Passed
11/14/2022 RSBU - Building Final Passed
11/14/2022 COT - FCON - Sprinkler - Final Passed
11/14/2022 COT - RSPL - Yard Water Line Passed
11/14/2022 COT - RSEL - Outdoor Lighting Passed
11/14/2022 COT - RSPL - Sewer Passed
11/14/2022 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
1_APPLICATION.PDF DOCUMENTS VIEW
1_SITEPLAN.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
1_SPECIAL_INSPECTION.PDF DOCUMENTS VIEW