Permit: T21CM08793
Permit Details
Apply Date:
11/09/2021
Applicant:
Andrea Flood
Description:
SFR F40J19 T19-M0035
Outstanding Activity Conditions
Permit Number - T21CM08793
Permit Status: Issued
Permit Description: SFR F40J19 T19-M0035
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/12/2021 | ISSUED WITH PCRWRD CONDITIONS:NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM08793
Permit Description: SFR F40J19 T19-M0035
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/15/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 02/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
02/24/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 02/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
02/24/2022 | COT - RSBU - Preslab | Passed | {Activity date: 02/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
02/24/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 02/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
02/24/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 02/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
04/19/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/31/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - NR} | |
04/19/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/31/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready missing 2 STHD-10 holddowns per SHT S1.3 AND GLULAMB BEAM SAME LOCATION inspection stopped} | |
05/10/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 05/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CODE ECO} | |
05/10/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 05/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP TEP ECO} |
|
08/17/2022 | FCON – OH Piping & Hydro | Passed | {Activity date: 08/17/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - Approved on 8/1/2022 on T22FC00481} | |
08/18/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/19/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/18/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE 1. Over notch stud in laundry 2. Over notch stud in shower. 3. Block base of landing. 4. Line-set missing insulation in attic. 5. Repair hole in kitchen shear wall. 6. Fire block top of open chase at garage opening.} |
|
08/19/2022 | COT - LCBU - Framing | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/18/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE} | |
08/19/2022 | RSME - Mechanical Progress | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/18/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE} | |
09/13/2022 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Missing screws in some areas. Screws in perimeter need to be 3/8 from edge.} | |
11/07/2022 | COT - RSPL - Plumbing Final | Passed | SWG clearance required | |
11/14/2022 | COT - RSME - Mechanical Final | Passed | ||
11/14/2022 | RSBU - Building Final | Passed | ||
11/14/2022 | COT - FCON - Sprinkler - Final | Passed | ||
11/14/2022 | COT - RSPL - Yard Water Line | Passed | ||
11/14/2022 | COT - RSEL - Outdoor Lighting | Passed | ||
11/14/2022 | COT - RSPL - Sewer | Passed | ||
11/14/2022 | COT - RSEL - Electrical Final | Passed |