Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM08788
Permit Details
Apply Date:
11/09/2021
Applicant:
Andrea Flood
Description:
SFR F50E19 T19-M0030
Outstanding Activity Conditions
Permit Number - T21CM08788
Permit Status: Issued
Permit Description: SFR F50E19 T19-M0030
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/12/2021 | ISSUED WITH PCRWRD CONDITIONS:NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM08788
Permit Description: SFR F50E19 T19-M0030
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/11/2022 | COT - RSPL - Sewer | Passed | {Activity date: 02/11/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved} | |
02/11/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 02/11/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved} | |
02/14/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
02/14/2022 | COT - RSBU - Preslab | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
02/14/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
02/14/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/13/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 05/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 05/04/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
06/15/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 06/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO} | |
06/15/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 06/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 06/13/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Inspection canceled by contractor } ; {Activity date: 05/13/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - . CO 1. Fire block all chases that exceed 10’ vertically. 2. Large opening at patio door requires 2 king studs plate to plate without splices. 3. Provide details for mother-in-law room framing.} ; {Activity date: 05/04/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval on west wall first floor window openings are not per plan missing stud, 2nd floor east window openings not per plan missing stud, headers not correct on north wall} |
|
06/15/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 06/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP TEP ECO} |
|
08/26/2022 | COT - LCBU - Framing | Passed | {Activity date: 08/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/26/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/26/2022 | RSME - Mechanical Progress | Passed | {Activity date: 08/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/26/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 08/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/29/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 08/29/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/26/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE 1. Block kitchen register 2. Repair and block shear wall 3. Install anchor bolts within first 12” of all shear walls 4. Attach exhaust box to side of framing tighter 5. Romex out of wall on 2nd floor} |
|
08/30/2022 | FCON – OH Piping & Hydro | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - } | |
11/09/2022 | COT - RSPL - Plumbing Final | Passed | SWG clearance required | |
11/21/2022 | RSBU - Building Final | Passed | ||
11/21/2022 | COT - RSEL - Outdoor Lighting | Passed | ||
11/21/2022 | COT - RSME - Mechanical Final | Passed | ||
11/21/2022 | COT - FCON - Sprinkler - Final | Passed | ||
11/21/2022 | COT - RSEL - Electrical Final | Passed |