Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM08752
Permit Details
Apply Date:
11/08/2021
Applicant:
Fusion Plumbing and Air
Description:
(T21DV06819) Spot repair in 2 sections of the main sewer line. We will dig down and expose the sewer and replace a 4-foot section of broken Clay sewer line on the west side units. After repairs to the broken section, we will run a high-pressure jetter to remove all roots and debris stuck in the sewer line. Repairs to be made with PVC pipe and Clay x Plastic repair couplings.
Contractors:
- Fusion Plumbing and Air
Permit Reviews
Permit Number - T21CM08752
Permit Status: Final
Permit Description: (T21DV06819) Spot repair in 2 sections of the main sewer line. We will dig down and expose the sewer and replace a 4-foot section of
broken Clay sewer line on the west side units. After repairs to the broken section, we will run a high-pressure jetter to
remove all roots and debris stuck in the sewer line. Repairs to be made with PVC pipe and Clay x Plastic repair couplings.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/08/2021 | OTHER | 11/08/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM08752
Permit Description: (T21DV06819) Spot repair in 2 sections of the main sewer line. We will dig down and expose the sewer and replace a 4-foot section of
broken Clay sewer line on the west side units. After repairs to the broken section, we will run a high-pressure jetter to
remove all roots and debris stuck in the sewer line. Repairs to be made with PVC pipe and Clay x Plastic repair couplings.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/12/2021 | SITE - SEWER | DQUINN | Approved | Ap 2 repairs complete. Close permit |
| 01/28/2022 | PLUMBING - FINAL | DQUINN | Approved | Ap Close permit |