Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
11/02/2021
Applicant:
Ram Plumbing, Inc.
Description:
Pressure test 1 1/4 inch gas line and 1/2 inch gas line in same area to ensure lines hold pressure for inspection. Return following night and shut off gas to building. Remove section of 2 inch gas piping then install new tee fitting. Install new section of pipe and reconnect to existing 2 inch piping. Will re-light and necessary pilots that may go out during gas shut down process during this time. Cap off reduced line from newly installed tee fitting to be able to turn back on gas . Run new section of 1 1/4 inch gas line then tee off to connect to existing 1/2 inch gas line. Put both laterals as well as newly ran piping on pressure test for inspection next day. Return following morning at 7:00 a.m. to shut off gas and connect piping after lines are tested and passed. Will re-light and necessary pilots that may go out during gas shut down process during this time.
Contractors:
  • Ram Plumbing, Inc.

Permit Reviews

Permit Number - T21CM08645
Permit Status: Final
Permit Description: Pressure test 1 1/4 inch gas line and 1/2 inch gas line in same area to ensure lines hold pressure for inspection. Return following night and shut off gas to building. Remove section of 2 inch gas piping then install new tee fitting. Install new section of pipe and reconnect to existing 2 inch piping. Will re-light and necessary pilots that may go out during gas shut down process during this time. Cap off reduced line from newly installed tee fitting to be able to turn back on gas . Run new section of 1 1/4 inch gas line then tee off to connect to existing 1/2 inch gas line. Put both laterals as well as newly ran piping on pressure test for inspection next day. Return following morning at 7:00 a.m. to shut off gas and connect piping after lines are tested and passed. Will re-light and necessary pilots that may go out during gas shut down process during this time.
Start Date Submittal Complete Date Status  
11/02/2021 OTHER 11/09/2021 COMPLETED Review Details
11/16/2021 RESUBMITTAL 11/17/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T21CM08645
Permit Description: Pressure test 1 1/4 inch gas line and 1/2 inch gas line in same area to ensure lines hold pressure for inspection. Return following night and shut off gas to building. Remove section of 2 inch gas piping then install new tee fitting. Install new section of pipe and reconnect to existing 2 inch piping. Will re-light and necessary pilots that may go out during gas shut down process during this time. Cap off reduced line from newly installed tee fitting to be able to turn back on gas . Run new section of 1 1/4 inch gas line then tee off to connect to existing 1/2 inch gas line. Put both laterals as well as newly ran piping on pressure test for inspection next day. Return following morning at 7:00 a.m. to shut off gas and connect piping after lines are tested and passed. Will re-light and necessary pilots that may go out during gas shut down process during this time.
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/23/2021 PLUMBING - FINAL DQUINN Approved Ap

Close permit
11/23/2021 PLUMBING - GAS PRESSURE TEST DQUINN Approved Ap
SWG designed repairs complete.

No clearance needed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLAN.PDF DOCUMENTS VIEW