Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/02/2021
Applicant:
Description:
Building Shell only, T.I. on separate permit

Permit Reviews

Permit Number - T21CM08628
Permit Status: Complete
Permit Description: Building Shell only, T.I. on separate permit
Start Date Submittal Complete Date Status  
01/21/2022 POST 3RD PARTY REVIEW 01/21/2022 COMPLETED Review Details
05/24/2022 REVISION - - 1ST 07/11/2022 COMPLETED Review Details
11/02/2021 3RD PARTY REVIEW - COMMERCIAL 01/11/2022 COMPLETED Review Details
07/07/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/17/2023 APPROVED Review Details
07/07/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/07/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T21CM08628
Permit Status: Complete
Permit Description: Building Shell only, T.I. on separate permit
Date Description Comments
01/07/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
01/07/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
01/07/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
01/07/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
01/07/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/07/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
01/07/2022 SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED WOOD TRUSSES

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08628
Permite Description: Building Shell only, T.I. on separate permit
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
11/02/2022 COT - LCBU - Framing N/A Partial Pass Roof nailing of South half of main roof.
11/02/2022 COT - LCBU - Roof Nailing N/A Partial Pass South half of main roof. Tower remains in to be inspected.
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/26/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Not Ready
10/26/2022 COT - FCON - Underground Pressure N/A Not Ready
FCON – OH Piping & Hydro N/A Not Ready
06/26/2023 COT - FCON - Alarm - Final N/A Not Ready subs need to call in their permits.
06/28/2023 COT - FCON - Sprinkler - Final N/A Partial Pass Spinklers east of firewall are approved. One head in restroom was painted, needs to be replaced.
10/26/2023 COT - HCBU - CofO N/A Not Applicable
07/05/2023 COT - FCON - Fire - Final N/A Partial Pass Building east of firewall approved to obtain Level 4 TCO
07/06/2023 COT - LCBU - Building Final N/A Partial Pass TCO level 4 issued TFD also issued level 4 TCO. C of O apply to 2/3 DOC office west 3rd not ready at the time of the inspection. Spoke to the inspector we do not issue TCO on Shell Building C of O will be issued on TI

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08628
Permit Description: Building Shell only, T.I. on separate permit
Total Completed Inspections - 16
Date Description Inspector Results Comments
03/29/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 03/29/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
10/06/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 10/06/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - PA. 3rd lift.} ; {Activity date: 09/26/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - PA: Balance of 2nd lift, and top out of South wall from West end 40’ East.} ; {Activity date: 09/21/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Partial Approval: 2nd lift, South Wall, center 50’. 3rd lift, South Wall, 40’ from West end.} ; {Activity date: 09/15/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Partial Approval: west wall, top out.} ; {Activity date: 09/12/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Partial Approval-3rd lift, West wall.} ; {Activity date: 09/07/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Partial Approval: 2nd lift, West Wall.} ; {Activity date: 09/06/2022; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Cancel per phone call with contractor.} ; {Activity date: 08/31/2022; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Not Ready} ; {Activity date: 08/30/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Partial Approval: Fourth lift, Balance of North wall and East wall.

} ; {Activity date: 08/25/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. 2nd lift. 4 to 8 feet. From NE corner go west 47 feet. Entire East side wall.} ; {Activity date: 08/19/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Partial Approval: Top out on North wall from West end , 165 feet East.

} ; {Activity date: 08/16/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Partial Approval: Third lift, North wall, from West end 155 feet East.} ; {Activity date: 08/15/2022; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Cancel per voicemail from contractor.} ; {Activity date: 08/09/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Partial Approval-Balance of First lift, Second lift; East half of North Wall.} ; {Activity date: 08/04/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Partial Approval-First lift; North 12’ of West wall, North wall, and East wall.}
12/09/2022 COT - LCPL - Plumbing Roof Drains Passed
12/22/2022 COT - LCPL - Medical Gas Preconstruction Mtg Passed
02/14/2023 COT - LCBU - Framing Passed
04/05/2023 COT - LCBU - Building Above Ceiling Passed
05/12/2023 COT - LCPL - Plumbing Final Passed
05/24/2023 COT - LCBU - Roof Nailing Passed
05/24/2023 COT - LCBU - Preslab Passed
05/24/2023 COT - LCBU - Stem Wall/Retaining Wall Passed
05/24/2023 COT - LCPL - Plumbing Intermediate Passed
06/26/2023 COT - FCON - Underground Flush Passed
10/26/2023 COT - FCON - Alarm - Final Passed
10/20/2023 COT - FCON - Sprinkler - Final Passed
10/26/2023 COT - FCON - Fire - Final Passed
10/26/2023 COT - LCBU - Building Final Passed 10/26/23: OK to issue a Letter of Completion for this shell building.

Documents

File Name Document Type  
REV1 JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_1_REVISION NARRATIVE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV_1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TRUSS SUBMITTAL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
20230707152045-2023-07-07_V2.PDF DOCUMENTS VIEW
REV_1_PLAN SET.PDF DOCUMENTS VIEW
REV1 JOB CARD.PDF DOCUMENTS VIEW
REV1_APPLICATION.PDF DOCUMENTS VIEW
REV1PERMIT.PDF DOCUMENTS VIEW
REV1_1_REVISION NARRATIVE.PDF DOCUMENTS VIEW
TRUSS SUBMITTAL.PDF DOCUMENTS VIEW
COMCHECK.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOTECH EVALUATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PSA.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW