booster station, wet well, electrical building, wall and fence modifications

Permit Reviews

Permit Number - T21CM08617
Permit Status: Complete
Permit Description: booster station, wet well, electrical building, wall and fence modifications
Start Date Submittal Complete Date Status  
01/06/2022 RESUBMITTAL - TI ALL 02/02/2022 COMPLETED Review Details
02/07/2022 RESUBMITTAL 03/16/2022 COMPLETED Review Details
11/02/2021 COMMERCIAL - TI 11/26/2021 COMPLETED Review Details
02/02/2023 COMMERCIAL REVIEW - FULL v.1 02/06/2023 REQUIRES RESUBMIT Review Details
11/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/22/2023 APPROVED Review Details
02/16/2023 COMMERCIAL REVIEW - FULL v.2 03/01/2023 APPROVED Review Details

Conditions

Permit Number - T21CM08617
Permit Status: Complete
Permit Description: booster station, wet well, electrical building, wall and fence modifications
Date Description Comments
11/11/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
11/11/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
11/11/2021 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
11/11/2021 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
11/11/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
11/11/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
11/11/2021 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
11/11/2021 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/11/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/11/2021 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08617
Permite Description: booster station, wet well, electrical building, wall and fence modifications
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
06/06/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Canceled {Activity date: 06/06/2022; Status: Not Applicable; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NA}
11/01/2022 COT - LCBU - Masonry Pregrout N/A Partial Pass Partial for 1st lift of the West perimeter wall, okay to grout progress areas
12/01/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
02/17/2023 COT - LCEL - Outdoor Lighting N/A Not Ready
10/04/2023 COT - LCEL - Construction Power N/A Not Applicable
09/29/2023 COT - LCBU - Building Final N/A Partial Pass 9/29/23 need concrete stoop at side door
03/24/2023 COT - HCBU - CofO N/A Partial Pass Approval recommended for TCO level 2 (staff and training only)

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08617
Permit Description: booster station, wet well, electrical building, wall and fence modifications
Total Completed Inspections - 18
Date Description Inspector Results Comments
06/23/2022 COT - LCBU - Framing Passed {Activity date: 06/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved roof frame and decking per Special Inspection} ; {Activity date: 06/20/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial roof beams are in place}
07/28/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 07/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 05/20/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for the electric building, okay for concrete placement} ; {Activity date: 05/10/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for the electric building, okay for concrete placement} ; {Activity date: 03/23/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Partial for (4) pump can foundations, okay to pour progress areas}
07/28/2022 COT - LCBU - Preslab Passed {Activity date: 07/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 05/19/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for the Electric Building, okay for concrete placement

}
10/05/2022 COT - LCEL - Electrical Underground Passed {Activity date: 10/05/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to backfill} ; {Activity date: 06/22/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for conduits to Booster cans, okay for slurry placement} ; {Activity date: 04/20/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval within building footprint

}
11/03/2022 COT - LCBU - Masonry Pregrout Passed
12/01/2022 COT - LCEL - Electrical Above Ceiling Passed inspection is n/a
12/02/2022 COT - LCBU - Building Progress Passed
01/24/2023 BULD - Electrical Clearance Passed Approved for temporary power at permanent service location , TEC Clearance to TEP is required to energize
01/24/2023 COT - LCEL - Electrical Progress Passed SES
01/24/2023 COT - LCEL - Temporary Service Passed Approved for temporary power at permanent service location , TEC Clearance to TEP is required to energize
02/08/2023 COT - LCME - Mechanical Intermediate Passed mechanical is completed. all ductwork in place with registers.
02/22/2023 COT - LCEL - Outdoor Lighting Passed
03/24/2023 COT - LCEL - Electrical Intermediate Passed
03/24/2023 COT - LCEL - Grounding/Bonding Passed
09/29/2023 COT - LCME - Mechanical Final Passed
09/29/2023 COT - LCEL - Electrical Final Passed
10/04/2023 COT - LCBU - Building Final Passed
10/05/2023 COT - HCBU - CofO Passed