Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
4267 N 4TH AV BLDG 1
Apply Date:
11/01/2021
Applicant:
Erin Harris
Description:
Townhomes - Building 1

Permit Reviews

Permit Number - T21CM08577
Permit Status: Complete
Permit Description: Townhomes - Building 1
Start Date Submittal Complete Date Status  
03/25/2022 RESUBMITTAL 05/09/2022 COMPLETED Review Details
05/12/2022 RESUBMITTAL 05/19/2022 COMPLETED Review Details
06/04/2022 RESUBMITTAL 06/15/2022 COMPLETED Review Details
11/01/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 12/08/2021 COMPLETED Review Details
03/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/20/2023 APPROVED Review Details
01/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/18/2024 APPROVED Review Details
01/22/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/22/2024 REQUIRES RESUBMIT Review Details
01/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/02/2024 APPROVED Review Details

Conditions

Permit Number - T21CM08577
Permit Status: Complete
Permit Description: Townhomes - Building 1
Date Description Comments
06/14/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/14/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
06/14/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
06/14/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/14/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/15/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
01/22/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/12/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08577
Permite Description: Townhomes - Building 1
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
03/13/2023 COT - LCBU - Building Progress N/A Re-inspection required 3-13-23: Install grounding per Code.
05/22/2023 RSME - Mechanical Progress N/A Not Applicable duplicate
06/20/2023 COT - HCBU - Interior Shear Bracing N/A Partial Pass
10/09/2023 COT - RSPL - Plumbing Final N/A Partial Pass
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
11/29/2023 RSBU - Building Final N/A Not Ready . 11/29/23: not ready
09/19/2023 COT - LCEL - Electrical Progress N/A Not Ready 9/19/23: Not ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08577
Permit Description: Townhomes - Building 1
Total Completed Inspections - 33
Date Description Inspector Results Comments
02/07/2023 COT - RSPL - Sewer Passed okay to backfill.
02/07/2023 COT - RSPL - Rough Soil Passed okay to backfill.
02/08/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
02/08/2023 COT - RSBU - Preslab Passed
03/14/2023 COT - LCBU - Building Progress Passed
03/16/2023 COT - RSBU - Roof Nailing Passed
03/16/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/03/2023 COT - RSPL - Yard Water Line Passed
05/03/2023 COT - LCPL - Plumbing Above Ceiling Passed
05/03/2023 RSEL - Electrical Progress Passed
05/22/2023 COT - LCBU - Framing Passed
05/22/2023 COT - LCME - Mechanical Progress Passed
05/22/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
05/22/2023 COT - LCPL - Plumbing Intermediate Passed
05/22/2023 COT - LCEL - Electrical Above Ceiling Passed
05/22/2023 RSPL - Plumbing Progress Passed
06/26/2023 COT - HCBU - Interior Shear Bracing Passed
09/22/2023 BULD - Electrical Clearance Passed 9/22/23: ECO TEP Clearance Building 1 unit 1001,1002,1003,1004 ok to energize
10/11/2023 COT - LCEL - Outdoor Lighting Passed
10/23/2023 COT - RSEL - Outdoor Lighting Passed
12/21/2023 COT - FCON - Alarm - Final Passed Approved for tco level 4
12/21/2023 COT - FCON - Sprinkler - Final Passed
12/21/2023 COT - FCON - Fire - Final Passed OK for TCO level 4
02/12/2024 RSBU - Building Final Passed Okay for CofO. 2/12/2O24
02/14/2024 COT - BULD - SWG Clearance Passed n/a
02/15/2024 ENGR Engineering Final Passed
02/14/2024 COT - RSME - Mechanical Final Passed
02/14/2024 COT - LCEL - Electrical Progress Passed
02/14/2024 COT - RSEL - Electrical Final Passed
02/14/2024 COT - RSEL - Electrical Underground Passed
02/14/2024 COT - LCPL - Backwater Valve Passed
02/14/2024 COT - LCBU - Sustainability Passed
02/14/2024 COT - LCBU - Building Above Ceiling Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
2_220825 - SAN JUNIPERO TOWNHOMES BUILDING 1 - PT REPORT-2024-01-30_V2.PDF DOCUMENTS VIEW
220825 - SAN JUNIPERO - FINAL SITE REPORT_V1.PDF DOCUMENTS VIEW
SAN JUNIPERO TOWNHOMES_SSI MASONRY LETTER_2024-01-29_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
CONS-STAMPED - APPROVED BUILDING PLAN SET_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
CIVIL UTILITY SHEET.PDF DOCUMENTS VIEW
JOB CARD 8577.PDF DOCUMENTS VIEW
PERMIT 8577.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLDG B_CAE REVIEW_2023-02-06_V1.PDF DOCUMENTS VIEW
BLDG C_CAE REVIEW_2023-02-06_V1.PDF DOCUMENTS VIEW
R74470003.Q2201560A_CAE REVIEW_2022-02-06_V1.PDF DOCUMENTS VIEW
R74492929.Q2201595A_CAE REVIEW_2023-02-06_V1.PDF DOCUMENTS VIEW
SAN JUNIPERO FORTE CALCS 01-17-23 SEAL FINAL_CAE REVIEW_2023-01-23_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
CIVIL UTILITY SHEET.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW