Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Apply Date:
10/29/2021
Applicant:
Dana Petty
Description:
E - SFR MERI238019 T19-M0112

Permit Reviews

Permit Number - T21CM08540
Permit Status: Expired
Permit Description: E - SFR MERI238019 T19-M0112
Start Date Submittal Complete Date Status  
01/04/2022 REVISION - - 2ND 01/18/2022 COMPLETED Review Details
12/18/2021 REVISION - - 1ST 01/04/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM08540
Permit Status: Expired
Permit Description: E - SFR MERI238019 T19-M0112
Total Outstanding Activity Conditions - 3
Date Name
10/29/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/29/2021 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/29/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Completed Inspections

Permit Status: Expired
Permit Number: T21CM08540
Permit Description: E - SFR MERI238019 T19-M0112
Total Completed Inspections - 23
Date Description Inspector Results Comments
01/12/2022 COT - RSPL - Yard Water Line Passed {Activity date: 01/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
01/12/2022 COT - RSPL - Sewer Passed {Activity date: 01/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
01/12/2022 COT - RSPL - Rough Soil Passed {Activity date: 01/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
01/18/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 01/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
01/18/2022 COT - RSBU - Preslab Passed {Activity date: 01/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
01/18/2022 COT - RSEL - Electrical Underground Passed {Activity date: 01/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
01/18/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 01/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
01/31/2022 COT - RSBU - Roof Nailing Passed {Activity date: 01/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - . AP} ; {Activity date: 01/28/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR}
02/02/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 02/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} ; {Activity date: 01/31/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CO
Relieve all mechanical connections to the bottom of floor and roof trusses to interior walls until the roof is fully loaded with tile, as noted in structural details.
Cripple block 2nd floor girder truss above window.} ; {Activity date: 01/28/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR}
02/07/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 02/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO}
02/07/2022 COT - RSEL - Construction Power Passed {Activity date: 02/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP
TEP ECO

} ; {Activity date: 02/04/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR}
02/10/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
02/10/2022 COT - LCBU - Framing Passed {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
02/10/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
02/10/2022 RSME - Mechanical Progress Passed {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
02/10/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
02/18/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 02/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/06/2022 COT - BULD - SWG Clearance Passed {Activity date: 04/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE}
04/22/2022 COT - RSME - Mechanical Final Passed {Activity date: 04/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/22/2022 RSBU - Building Final Passed {Activity date: 04/22/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - APPROVED BY INSPECTOR AWAITING CONDITIONS} ; {Activity date: 04/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 04/15/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR
1. Replace broken window
2. Paint front door and all stucco repairs
3. Clean all debris from inside and outside of house.
NOT READY FOR INSPECTION}
04/22/2022 COT - RSEL - Outdoor Lighting Passed {Activity date: 04/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/22/2022 COT - RSPL - Plumbing Final Passed {Activity date: 04/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 04/06/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA
SWG clearance required.}
04/22/2022 COT - RSEL - Electrical Final Passed {Activity date: 04/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}

Documents

File Name Document Type  
1_PLOT PLAN - LOT 29.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLOT PLAN REV1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET REV2.PDF DOCUMENTS VIEW
REV2 APPLICATION.PDF DOCUMENTS VIEW
REV1_SITE PLAN.PDF DOCUMENTS VIEW
REV1 NARRATIVE.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
PERMIT APPLICATION.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
REV2 PERMIT.PDF DOCUMENTS VIEW
REV1 APPLICATION.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
REV2 JOB CARD.PDF DOCUMENTS VIEW
REV2 LETTER.PDF DOCUMENTS VIEW