Permit: T21CM08540
Permit Details
Apply Date:
10/29/2021
Applicant:
Dana Petty
Description:
E - SFR MERI238019 T19-M0112
Permit Reviews
Permit Number - T21CM08540
Permit Status: Expired
Permit Description: E - SFR MERI238019 T19-M0112
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/04/2022 | REVISION - - 2ND | 01/18/2022 | COMPLETED |
12/18/2021 | REVISION - - 1ST | 01/04/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T21CM08540
Permit Status: Expired
Permit Description: E - SFR MERI238019 T19-M0112
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
10/29/2021 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
10/29/2021 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
10/29/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Completed Inspections
Permit Status: Expired
Permit Number: T21CM08540
Permit Description: E - SFR MERI238019 T19-M0112
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/12/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 01/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
01/12/2022 | COT - RSPL - Sewer | Passed | {Activity date: 01/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
01/12/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 01/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
01/18/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
01/18/2022 | COT - RSBU - Preslab | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
01/18/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
01/18/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
01/31/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 01/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - . AP} ; {Activity date: 01/28/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR} | |
02/02/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 02/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} ; {Activity date: 01/31/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CO Relieve all mechanical connections to the bottom of floor and roof trusses to interior walls until the roof is fully loaded with tile, as noted in structural details. Cripple block 2nd floor girder truss above window.} ; {Activity date: 01/28/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR} |
|
02/07/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 02/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO} | |
02/07/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 02/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP TEP ECO } ; {Activity date: 02/04/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR} |
|
02/10/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} | |
02/10/2022 | COT - LCBU - Framing | Passed | {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} | |
02/10/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} | |
02/10/2022 | RSME - Mechanical Progress | Passed | {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} | |
02/10/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} | |
02/18/2022 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 02/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/06/2022 | COT - BULD - SWG Clearance | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE} | |
04/22/2022 | COT - RSME - Mechanical Final | Passed | {Activity date: 04/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/22/2022 | RSBU - Building Final | Passed | {Activity date: 04/22/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - APPROVED BY INSPECTOR AWAITING CONDITIONS} ; {Activity date: 04/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 04/15/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR 1. Replace broken window 2. Paint front door and all stucco repairs 3. Clean all debris from inside and outside of house. NOT READY FOR INSPECTION} |
|
04/22/2022 | COT - RSEL - Outdoor Lighting | Passed | {Activity date: 04/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/22/2022 | COT - RSPL - Plumbing Final | Passed | {Activity date: 04/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 04/06/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA SWG clearance required.} |
|
04/22/2022 | COT - RSEL - Electrical Final | Passed | {Activity date: 04/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} |