Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
10/29/2021
Applicant:
Description:
Accessary Addition

Permit Reviews

Permit Number - T21CM08534
Permit Status: Issued
Permit Description: Accessary Addition
Start Date Submittal Complete Date Status  
01/31/2022 RESUBMITTAL 02/07/2022 COMPLETED Review Details
03/11/2022 RESUBMITTAL 03/15/2022 COMPLETED Review Details
10/29/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 11/30/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Issued
Permit Number: T21CM08534
Permit Description: Accessary Addition
Total Completed Inspections - 15
Date Description Inspector Results Comments
04/28/2022 COT - RSME - Hydronic Piping Passed {Activity date: 04/28/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, HVAC line sets re located and ok to backfill.}
04/28/2022 COT - RSEL - Electrical Underground Passed {Activity date: 04/28/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, HVAC raceways and conductors re located and ok to backfill.}
05/09/2022 COT - RSBU - Preslab Passed {Activity date: 05/09/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
05/09/2022 COT - RSPL - Sewer Passed {Activity date: 05/09/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
05/09/2022 COT - RSPL - Rough Soil Passed {Activity date: 05/09/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
05/09/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/09/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 04/28/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready}
06/03/2022 COT - RSBU - Roof Nailing Passed {Activity date: 06/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/03/2022 COT - LCBU - Framing Passed {Activity date: 06/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/03/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 06/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/09/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 08/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved. Previous notes were corrected.} ; {Activity date: 08/01/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE
1. AC duct not per plan
2. Foam/draft-stop top of wall at house stucco
3. Install new high/low air intake in the existing garage
4. Fill in abandoned high/low air intake
5. Provide access to j-boxes on stucco wall
6. Fill in gap in AC platform to catwalk} ; {Activity date: 06/15/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready, see previous inspector notes.} ; {Activity date: 06/14/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR
Dry in walls and lath, dry in roof and load tile before calling for intermediate inspection.} ; {Activity date: 06/10/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - corrections required, block mechanical registers 3 sides.}
10/10/2022 COT - RSME - Mechanical Final Passed {Activity date: 10/10/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
10/10/2022 COT - RSEL - Outdoor Lighting Passed {Activity date: 10/10/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
10/14/2022 RSBU - Building Final Passed {Activity date: 10/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/10/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Receptacle on north side of wall has an open ground. Provide shut off valve on cold water line for water heater.}
10/14/2022 COT - RSPL - Plumbing Final Passed {Activity date: 10/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/10/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Provide a shut off valve on the cold line for water heater. Provide elbows on draining lines.}
10/14/2022 COT - RSEL - Electrical Final Passed {Activity date: 10/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/10/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Receptacle on north side off wall has an open ground.}

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW