Permit: T21CM08534
Permit Details
Apply Date:
10/29/2021
Applicant:
Description:
Accessary Addition
Permit Reviews
Permit Number - T21CM08534
Permit Status: Issued
Permit Description: Accessary Addition
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/31/2022 | RESUBMITTAL | 02/07/2022 | COMPLETED |
03/11/2022 | RESUBMITTAL | 03/15/2022 | COMPLETED |
10/29/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 11/30/2021 | COMPLETED |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM08534
Permit Description: Accessary Addition
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/28/2022 | COT - RSME - Hydronic Piping | Passed | {Activity date: 04/28/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, HVAC line sets re located and ok to backfill.} | |
04/28/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 04/28/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, HVAC raceways and conductors re located and ok to backfill.} | |
05/09/2022 | COT - RSBU - Preslab | Passed | {Activity date: 05/09/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
05/09/2022 | COT - RSPL - Sewer | Passed | {Activity date: 05/09/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/09/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/09/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/09/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 05/09/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 04/28/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready} | |
06/03/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 06/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/03/2022 | COT - LCBU - Framing | Passed | {Activity date: 06/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/03/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 06/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/09/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 08/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved. Previous notes were corrected.} ; {Activity date: 08/01/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE 1. AC duct not per plan 2. Foam/draft-stop top of wall at house stucco 3. Install new high/low air intake in the existing garage 4. Fill in abandoned high/low air intake 5. Provide access to j-boxes on stucco wall 6. Fill in gap in AC platform to catwalk} ; {Activity date: 06/15/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready, see previous inspector notes.} ; {Activity date: 06/14/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR Dry in walls and lath, dry in roof and load tile before calling for intermediate inspection.} ; {Activity date: 06/10/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - corrections required, block mechanical registers 3 sides.} |
|
10/10/2022 | COT - RSME - Mechanical Final | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
10/10/2022 | COT - RSEL - Outdoor Lighting | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
10/14/2022 | RSBU - Building Final | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/10/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Receptacle on north side of wall has an open ground. Provide shut off valve on cold water line for water heater.} | |
10/14/2022 | COT - RSPL - Plumbing Final | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/10/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Provide a shut off valve on the cold line for water heater. Provide elbows on draining lines.} | |
10/14/2022 | COT - RSEL - Electrical Final | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/10/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Receptacle on north side off wall has an open ground.} |