Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
1039 E GIFFORD DR
Apply Date:
10/29/2021
Applicant:
Description:
Art Studio and Porch

Permit Reviews

Permit Number - T21CM08525
Permit Status: Complete
Permit Description: Art Studio and Porch
Start Date Submittal Complete Date Status  
10/29/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 11/30/2021 COMPLETED Review Details
12/07/2021 RESUBMITTAL 12/15/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08525
Permite Description: Art Studio and Porch
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - RSBU - Roof Nailing N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Framing N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Plumbing Intermediate N/A Canceled Inspection Canceled
11/04/2022 COT - RSPL - Yard Water Line N/A Canceled Inspection Canceled
11/04/2022 COT - RSEL - Construction Power N/A Canceled Inspection Canceled
11/04/2022 RSME - Mechanical Progress N/A Canceled Inspection Canceled
11/04/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Canceled Inspection Canceled
06/06/2023 COT - RSPL - Plumbing Final N/A Re-inspection required 6/6/23: Sink missing (per plans), 2 anti siphon hose bibs missing at exterior perimeter (per plans), countertop receptacle spaced 5'6”.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08525
Permit Description: Art Studio and Porch
Total Completed Inspections - 14
Date Description Inspector Results Comments
01/19/2023 COT - RSPL - Rough Soil Passed
01/19/2023 COT - RSPL - Sewer Passed
01/23/2023 COT - RSEL - Electrical Underground Passed
01/23/2023 COT - RSBU - Preslab Passed
02/08/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/03/2023 RSPL - Plumbing Progress Passed Plumbing rough in is complete and meets plans.
03/03/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough in is complete and meets plans.
04/14/2023 BULD - Electrical Clearance Passed Clearance incr for cutover scheduling
04/14/2023 COT - RSEL - Grounding/Bonding Passed
06/06/2023 COT - RSME - Mechanical Final Passed
06/06/2023 COT - RSEL - Outdoor Lighting Passed
06/22/2023 COT - RSPL - Plumbing Final Passed
06/23/2023 RSBU - Building Final Passed
06/23/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
LOAD CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
LOAD CALCS.PDF DOCUMENTS VIEW