Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
5844 E GRANT RD
Address NEW:
5844 E GRANT RD
Apply Date:
10/19/2021
Applicant:
Description:
- SYSTEM SIZE: 5600W DC, 3840W AC- MODULES: (16) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350- INVERTERS: (16)

Permit Reviews

Permit Number - T21CM08231
Permit Status: Issued
Permit Description: - SYSTEM SIZE: 5600W DC, 3840W AC- MODULES: (16) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350- INVERTERS: (16)
Start Date Submittal Complete Date Status  
10/19/2021 OTHER 11/12/2021 COMPLETED Review Details

Conditions

Permit Number - T21CM08231
Permit Status: Issued
Permit Description: - SYSTEM SIZE: 5600W DC, 3840W AC- MODULES: (16) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350- INVERTERS: (16)
Date Description Comments
10/19/2021 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM08231
Permite Description: - SYSTEM SIZE: 5600W DC, 3840W AC- MODULES: (16) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350- INVERTERS: (16)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/27/2022 RSBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T21CM08231
Permit Description: - SYSTEM SIZE: 5600W DC, 3840W AC- MODULES: (16) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350- INVERTERS: (16)
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/24/2022 BULD - Electrical Clearance Passed {Activity date: 03/24/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - CODE INCR}
03/24/2022 COT - RSEL - Service Upgrade Passed {Activity date: 03/24/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap
Called TEP at 1
} ; {Activity date: 02/07/2022; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -CA per voicemail from contractor.}
03/24/2022 COT - RSEL - Electrical Final Passed {Activity date: 03/24/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap

Clear incr

Close permit}
05/17/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 05/17/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - CODE DGC}

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPEC SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SPEC SHEETS.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW