Permit Details

Status:
Complete
Type:
Commercial Building
Address:
4101 S 6TH AV
Address NEW:
4101 S 6TH AV
Apply Date:
10/15/2021
Applicant:
Description:
TI: RETAIL

Permit Reviews

Permit Number - T21CM08192
Permit Status: Complete
Permit Description: TI: RETAIL
Start Date Submittal Complete Date Status  
02/14/2023 COMMERCIAL REVIEW - FULL v.1 03/30/2023 APPROVED Review Details

Conditions

Permit Number - T21CM08192
Permit Status: Complete
Permit Description: TI: RETAIL
Date Description Comments
12/23/2022 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
10/26/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
10/26/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
10/26/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/23/2022 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08192
Permite Description: TI: RETAIL
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/20/2022 COT - LCBU - Masonry Pregrout N/A Not Applicable {Activity date: 07/20/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Applicable
}
07/26/2022 COT - FCON - Sprinkler - Final N/A Not Applicable {Activity date: 07/26/2022; Status: Not Applicable; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 07/20/2022; Status: Denied; Inspector: jfordney; Comment: Entered by JFORDNE1 - }

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08192
Permit Description: TI: RETAIL
Total Completed Inspections - 17
Date Description Inspector Results Comments
04/05/2022 COT - LCBU - Framing Passed {Activity date: 04/05/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to cover walls} ; {Activity date: 03/30/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready

Called contact multiple times, re call inspection and provide correct information to schedule.}
04/05/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 04/05/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
04/05/2022 COT - LCPL - Rough Soil Passed {Activity date: 04/05/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved to yard connection, okay to backfill and interior concrete placement

*note: Please revise contact # to 520-955-0777 for CONTRACTOR: G R B GROUP , Thank you

} ; {Activity date: 03/30/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready

Called contact multiple times, re call inspection and provide correct information to schedule.}
05/26/2022 COT - LCBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 05/26/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved

** Please revise the contact # information: 520-955-0777}
06/14/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 06/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
06/14/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 06/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 04/05/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial, pending above ceiling} ; {Activity date: 03/30/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready

Called contact multiple times, re call inspection and provide correct information to schedule.}
06/14/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 06/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
06/14/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 06/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 04/05/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial, pending above ceiling}
06/14/2022 COT - LCBU - Building Progress Passed {Activity date: 06/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
07/26/2022 COT - LCPL - Gas Pressure Test Passed {Activity date: 07/26/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, please send Clearance to SWG for gas service} ; {Activity date: 07/20/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready}
07/26/2022 COT - LCBU - Building Final Passed {Activity date: 07/26/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, pending FIRE, and REPORTS} ; {Activity date: 07/20/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready, submit special inspection reports & clear outstanding conditions.}
07/26/2022 COT - LCEL - Outdoor Lighting Passed {Activity date: 07/26/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
07/26/2022 COT - LCEL - Electrical Final Passed {Activity date: 07/26/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/20/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready, no access}
07/26/2022 COT - BULD - SWG Clearance Passed {Activity date: 07/26/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE GAS}
07/29/2022 COT - FCON - Fire - Final Passed {Activity date: 07/29/2022; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 07/26/2022; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - EM lights near front door
Address identification} ; {Activity date: 07/20/2022; Status: Denied; Inspector: jfordney; Comment: Entered by JFORDNE1 - Arrived 9:20am. Nobody onsite, no access to building.
Reinspection fee added.}
10/26/2022 COT - LCME - Mechanical Final Passed 03/30/23 Rick Saldate permit clean up, building final passed.
10/26/2022 COT - LCPL - Plumbing Final Passed 03/30/23 Rick Saldate, permit clean up, placed in passed status. Building Final is currently in passed stutus by assigned inspector.

Documents

File Name Document Type  
T21CM08192 AIR BALANCE1.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECH CHECK 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECH SYSTEMS DESIGN REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
MECH CHECK.PDF DOCUMENTS VIEW
MECH SYSTEMS DESIGN REPORT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
TURNER LABS-2023-01-31_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REVISION LETTER - WITH STAMP 1-31-23_V1.PDF DOCUMENTS VIEW