Permit Details

Status:
Complete
Type:
Commercial Building
Address:
425 E 7TH ST
Apply Date:
10/08/2021
Applicant:
Cheyenne Palmer
Description:
Remodel

Permit Reviews

Permit Number - T21CM08012
Permit Status: Complete
Permit Description: Remodel
Start Date Submittal Complete Date Status  
03/12/2022 RESUBMITTAL 05/13/2022 COMPLETED Review Details
10/08/2021 3RD PARTY REVIEW - COMMERCIAL TI 03/04/2022 COMPLETED Review Details
01/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/24/2024 APPROVED Review Details
12/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T21CM08012
Permit Status: Complete
Permit Description: Remodel
Date Description Comments
02/03/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/03/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
02/03/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
02/03/2022 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
02/03/2022 SPECIAL INSPECTION IS REQUIRED FOR HELICAL PIERS.
02/03/2022 SPECIAL INSPECTION IS REQUIRED FOR STRUCTURAL STEEL.
02/03/2022 SHOP DRAWINGS REQUIRED FOR I-JOISTS

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08012
Permite Description: Remodel
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/01/2023 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass 11/1/23: 5 pole bases reinforcement per plan, electrical underground for 5 pole bases per plan.
02/22/2024 PDSD Building Division - Sign Final N/A Not Applicable
11/01/2023 COT - LCBU - Stem Wall/Retaining Wall N/A Partial Pass 7/27/23: Canceled by Dale
7/31/23: partial, okay to pour footing at new entry at hoff building
11/1/23: 5 pole bases reinforcement per plan, electrical underground for 5 pole bases per plan.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08012
Permit Description: Remodel
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/03/2023 COT - LCBU - Masonry Pregrout Passed 8/3/23: ok to grout
10/10/2023 COT - LCPL - Rough Soil Passed Domestic water line (1”) from meter to building. Ok to cover progress areas.
11/06/2023 COT - HCEL - Electrical Underground Passed 11-6-23: Electrical underground for 8-EV locations per plans. Okay to backfill trenches.
02/22/2024 COT - LCBU - Excavation/Rebar/Zoning Passed
02/23/2024 COT - LCBU - Building Final Passed
02/22/2024 PDSD Site/Engineering Division - Landscaping Passed
02/22/2024 COT - LCEL - Construction Power Passed
02/23/2024 COT - LCEL - Electrical Final Passed
02/22/2024 ENGR Engineering Final Passed
02/22/2024 COT - LCBU - Preslab Passed
02/22/2024 COT - FCON - Fire - Final Passed
02/22/2024 COT - LCEL - Temporary Service Passed
02/22/2024 COT - LCPL - Medical Gas Preconstruction Mtg Passed
02/22/2024 PDSD Site/Engineering Division - NPPO Passed
02/23/2024 COT - LCEL - Electrical Intermediate Passed
02/22/2024 COT - LCEL - Electrical Above Ceiling Passed
02/22/2024 COT - LCBU - Stem Wall/Retaining Wall Passed
02/23/2024 COT - LCEL - Outdoor Lighting Passed
02/22/2024 COT - LCPL - Plumbing Intermediate Passed
02/22/2024 COT - LCPL - Plumbing Above Ceiling Passed
02/22/2024 COT - LCPL - Plumbing Final Passed
02/28/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
WATER REPORT (T21CM07719)-2023-12-18_V1.PDF DOCUMENTS VIEW
CHECKLIST_SIGNED.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
PSA_STANTEC.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW