Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
10/04/2021
Applicant:
Dana Petty
Description:
E - MERI146019 T19-M0109

Outstanding Activity Conditions

Permit Number - T21CM07880
Permit Status: Issued
Permit Description: E - MERI146019 T19-M0109
Total Outstanding Activity Conditions - 2
Date Name
10/04/2021 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/04/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Completed Inspections

Permit Status: Issued
Permit Number: T21CM07880
Permit Description: E - MERI146019 T19-M0109
Total Completed Inspections - 23
Date Description Inspector Results Comments
11/01/2021 COT - RSPL - Yard Water Line Passed {Activity date: 11/01/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
11/01/2021 COT - RSPL - Sewer Passed {Activity date: 11/01/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
11/01/2021 COT - RSPL - Rough Soil Passed {Activity date: 11/01/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
11/08/2021 COT - RSEL - Grounding/Bonding Passed {Activity date: 11/08/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
11/08/2021 COT - RSBU - Preslab Passed {Activity date: 11/08/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
11/08/2021 COT - RSEL - Electrical Underground Passed {Activity date: 11/08/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
11/08/2021 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 11/08/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
12/03/2021 COT - RSBU - Roof Nailing Passed {Activity date: 12/03/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
12/03/2021 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 12/03/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
02/07/2022 COT - LCBU - Framing Passed {Activity date: 02/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
02/07/2022 COT - RSEL - Construction Power Passed {Activity date: 02/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - . AP. TEP ECO} ; {Activity date: 02/04/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR}
02/07/2022 BULD - Electrical Clearance Passed {Activity date: 02/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CODE ECO}
02/10/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/09/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO
1. Secure gas line at washer box
2. ABS dry
3. Reroute 4” duct above the shuttle hole opening.
Cancel all other inspections} ; {Activity date: 02/07/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CO
1. ABS empty
2. Gas lines not under test
3. PEX water line cut above patio door
4. Re-route 4” duct above shuttle hole opening}
02/24/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 02/24/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 02/09/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - Cancel all other inspections

} ; {Activity date: 02/07/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CO}
02/24/2022 RSME - Mechanical Progress Passed {Activity date: 02/24/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 02/09/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - Cancel all other inspections

} ; {Activity date: 02/07/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CO}
02/24/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 02/24/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 02/09/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - Cancel all other inspections

} ; {Activity date: 02/07/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CO}
02/24/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 02/24/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 02/23/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO
Excessive tears in shear wall Sheetrock.
Post lot & address signs at all houses under construction}
04/06/2022 COT - BULD - SWG Clearance Passed {Activity date: 04/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE}
04/25/2022 COT - RSME - Mechanical Final Passed {Activity date: 04/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/25/2022 RSBU - Building Final Passed {Activity date: 04/25/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - APPROVED BY INSPECTOR AWAITING CONDITIONS} ; {Activity date: 04/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/25/2022 COT - RSEL - Outdoor Lighting Passed {Activity date: 04/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/25/2022 COT - RSPL - Plumbing Final Passed {Activity date: 04/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 04/06/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA
SWG clearance required}
04/25/2022 COT - RSEL - Electrical Final Passed {Activity date: 04/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}

Documents

File Name Document Type  
1_APPLICATION - LOT 14.PDF DOCUMENTS VIEW
1_SITE PLAN - LOT 14.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERTIFICATE - LOT 14.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW