Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Address:
3150 E PIMA ST
Address NEW:
3150 E PIMA ST
Apply Date:
09/29/2021
Applicant:
Technicians for Sustainability
Description:
roof mount 7.51 kW photovoltaic solar system; 19 modules, 2 branches, PV subpanel, 40A PV breaker on 225A bus with 200A MCB, main service upgrade to PV ready panel
Contractors:
  • Technicians for Sustainability

Permit Reviews

Permit Number - T21CM07810
Permit Status: Final
Permit Description: roof mount 7.51 kW photovoltaic solar system; 19 modules, 2 branches, PV subpanel, 40A PV breaker on 225A bus with 200A MCB, main service upgrade to PV ready panel
Start Date Submittal Complete Date Status  
09/29/2021 OTHER 10/21/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T21CM07810
Permit Description: roof mount 7.51 kW photovoltaic solar system; 19 modules, 2 branches, PV subpanel, 40A PV breaker on 225A bus with 200A MCB, main service upgrade to PV ready panel
Total Completed Inspections - 5
Date Description Inspector Results Comments
12/16/2021 ELECTRIC - FINAL DQUINN Approved pa
Pv complete. Partial is for incr cutover.
12/16/2021 TEP CLEARANCE - PM DQUINN Approved CODE INCR/CUTOVER
12/16/2021 TEP CLEARANCE - PM DQUINN Approved CODE DGC
12/16/2021 BUILDING - FINAL DQUINN Approved Ap
For pv
12/16/2021 ELECTRIC - SERVICE UPGRADE DQUINN Approved Ap

Approve for increase cutover.

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPEC SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SPEC SHEETS.PDF DOCUMENTS VIEW