Permit: T21CM07756
Permit Details
Apply Date:
09/28/2021
Applicant:
jOSE MARTINEZ
Description:
SFR
Permit Reviews
Permit Number - T21CM07756
Permit Status: Complete
Permit Description: SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/03/2022 | RESUBMITTAL | 01/13/2022 | COMPLETED |
09/28/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/25/2021 | COMPLETED |
11/18/2021 | RESUBMITTAL | 12/02/2021 | COMPLETED |
Conditions
Permit Number - T21CM07756
Permit Status: Complete
Permit Description: SFR
Date | Description | Comments |
---|---|---|
01/13/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
01/13/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM07756
Permite Description: SFR
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
10/27/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
10/27/2022 | RSME - Mechanical Progress | N/A | Not Ready | |
10/26/2022 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM07756
Permit Description: SFR
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/03/2022 | COT - RSBU - Preslab | Passed | {Activity date: 03/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ensure slab is termite treated before placing concrete.} | |
03/03/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 03/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} | |
03/24/2022 | COT - RSPL - Sewer | Passed | {Activity date: 03/24/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover progress areas.} | |
06/27/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 06/27/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to dry in roof system. } |
|
06/27/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 06/27/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover exterior walls.} | |
09/02/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 03/18/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial (Pre-slab) Extension of existing slab. Ok to place concrete in progress areas} | |
09/02/2022 | COT - LCBU - Framing | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
09/02/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to backfill progress areas} | |
09/02/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for electrical service conduit from SFR #2 to primary home, okay to backfill progress areas} | |
09/02/2022 | COT - BULD - SWG Clearance | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - CODE} | |
09/02/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 02/28/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Interior waste and vent lines. Ok to cover progress areas.} | |
10/04/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 10/04/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - CODE INCR FOR #1 AND #2} | |
10/04/2022 | COT - RSEL - Service Upgrade | Passed | {Activity date: 10/04/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap Clear incr for #1 #2 Need cutover for final} |
|
12/14/2022 | COT - RSPL - Gas Pressure Test | Passed | No clearance needed | |
12/14/2022 | COT - RSPL - Plumbing Final | Passed | ||
12/14/2022 | COT - RSEL - Electrical Final | Passed | ||
12/14/2022 | COT - RSEL - Outdoor Lighting | Passed | ||
12/14/2022 | COT - RSEL - Construction Power | Passed | NA | |
12/14/2022 | COT - RSME - Mechanical Final | Passed | ||
12/14/2022 | RSBU - Building Final | Passed |