Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/28/2021
Applicant:
jOSE MARTINEZ
Description:
SFR

Permit Reviews

Permit Number - T21CM07756
Permit Status: Complete
Permit Description: SFR
Start Date Submittal Complete Date Status  
01/03/2022 RESUBMITTAL 01/13/2022 COMPLETED Review Details
09/28/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 10/25/2021 COMPLETED Review Details
11/18/2021 RESUBMITTAL 12/02/2021 COMPLETED Review Details

Conditions

Permit Number - T21CM07756
Permit Status: Complete
Permit Description: SFR
Date Description Comments
01/13/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
01/13/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM07756
Permite Description: SFR
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSEL - Grounding/Bonding N/A Not Ready
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/27/2022 RSME - Mechanical Progress N/A Not Ready
10/26/2022 COT - RSPL - Gas Pressure Test N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM07756
Permit Description: SFR
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/03/2022 COT - RSBU - Preslab Passed {Activity date: 03/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ensure slab is termite treated before placing concrete.}
03/03/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 03/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
03/24/2022 COT - RSPL - Sewer Passed {Activity date: 03/24/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover progress areas.}
06/27/2022 COT - RSBU - Roof Nailing Passed {Activity date: 06/27/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to dry in roof system.

}
06/27/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 06/27/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover exterior walls.}
09/02/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 03/18/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial (Pre-slab) Extension of existing slab. Ok to place concrete in progress areas}
09/02/2022 COT - LCBU - Framing Passed {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
09/02/2022 COT - RSPL - Yard Water Line Passed {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to backfill progress areas}
09/02/2022 COT - RSEL - Electrical Underground Passed {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for electrical service conduit from SFR #2 to primary home, okay to backfill progress areas}
09/02/2022 COT - BULD - SWG Clearance Passed {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - CODE}
09/02/2022 COT - RSPL - Rough Soil Passed {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 02/28/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Interior waste and vent lines. Ok to cover progress areas.}
10/04/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 10/04/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - CODE INCR FOR #1 AND #2}
10/04/2022 COT - RSEL - Service Upgrade Passed {Activity date: 10/04/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap

Clear incr for #1 #2

Need cutover for final}
12/14/2022 COT - RSPL - Gas Pressure Test Passed No clearance needed
12/14/2022 COT - RSPL - Plumbing Final Passed
12/14/2022 COT - RSEL - Electrical Final Passed
12/14/2022 COT - RSEL - Outdoor Lighting Passed
12/14/2022 COT - RSEL - Construction Power Passed NA
12/14/2022 COT - RSME - Mechanical Final Passed
12/14/2022 RSBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
T21CM07756 COFO.PDF DOCUMENTS VIEW