Permit: T21CM07603
Permit Details
Apply Date:
09/21/2021
Applicant:
Technicians for Sustainability
Description:
roof mount 2.80 kW photovoltaic solar system addition to existing system, 7 panels to be added, 1 branch circuit to be added, 60A PV breaker on 200A bus with 175A MCB, [main breaker derate from existing 200A]
Contractors:
- Technicians for Sustainability
Permit Reviews
Permit Number - T21CM07603
Permit Status: Final
Permit Description: roof mount 2.80 kW photovoltaic solar system addition to existing system, 7 panels to be added, 1 branch circuit to be added, 60A PV breaker on 200A bus with 175A MCB, [main breaker derate from existing 200A]
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/21/2021 | OTHER | 10/14/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM07603
Permit Description: roof mount 2.80 kW photovoltaic solar system addition to existing system, 7 panels to be added, 1 branch circuit to be added, 60A PV breaker on 200A bus with 175A MCB, [main breaker derate from existing 200A]
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/17/2021 | TEP CLEARANCE - PM | RCHANDLER | Approved | CODE DGC |
11/17/2021 | ELECTRIC - FINAL | RCHANDLER | Approved | AP DGC clearance for TEP. Sent text at 9:05 7:19; got voicemail requesting 11:15 12:00 312-523-9955 |
11/17/2021 | BUILDING - FINAL | RCHANDLER | Approved | AP |