Permit: T21CM07215
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3214 E FAIRMOUNT ST UNIT 2
Address NEW:
3214 E FAIRMOUNT ST UNIT 2
Apply Date:
09/07/2021
Applicant:
Description:
GUEST HOUSE
Permit Reviews
Permit Number - T21CM07215
Permit Status: Complete
Permit Description: GUEST HOUSE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/07/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/05/2021 | COMPLETED |
| 11/15/2021 | RESUBMITTAL | 11/16/2021 | COMPLETED |
| 11/16/2021 | RESUBMITTAL | 11/29/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM07215
Permite Description: GUEST HOUSE
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2022 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Install ultraviolet protection for linesets. |
| 11/10/2022 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 1-Bathroom lag drain has negative slope. 2-Install hammer arrest or for dishwasher. |
| 11/10/2022 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Install properly sized breaker for AC compressor disconnect per nameplate. |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM07215
Permit Description: GUEST HOUSE
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2021 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 12/06/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
| 02/11/2022 | COT - RSBU - Masonry Pregrout | Passed | {Activity date: 02/11/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 01/27/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. 2nd lift. 4 to 8 feet.} ; {Activity date: 01/13/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. 1st lift of 4 feet.} | |
| 03/11/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 03/11/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
| 03/11/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 03/11/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
| 03/23/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 03/23/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
| 04/01/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 04/01/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap Ok to backfill} |
|
| 04/06/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. From under slab to clay house piping.} ; {Activity date: 12/27/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - PA. Under slab.} | |
| 08/16/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/01/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - PARTIAL APPROVAL FOR ELECTRICAL ONLY} ; {Activity date: 06/29/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -DE. 1-Obtain 3035 inspection approval. 2-Obtain 1035 inspection approval. 3-Provide 30” of clearance in front of all junction boxes. 4- Complete electrical rough in. 5-Bond exposed metal post with electron it. 6- Seal all fire blocks. 7-Complete Mechanical rough in. } |
|
| 08/16/2022 | COT - LCBU - Framing | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/01/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval please install studs in center bearing wall add 24 inch on center please install plate anywhere where would touch his concrete} ; {Activity date: 03/11/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready.} | |
| 08/16/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -PA. House only; columns and Porch remain to be inspected.} | |
| 08/16/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/01/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval no DWV TEST POTABLE WATER IS OK } ; {Activity date: 06/29/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -DE. Provide test for DWV piping.} |
|
| 08/16/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved ok for clearance INCR} | |
| 08/16/2022 | BULD - Electrical Clearance | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - CODE INCR} | |
| 08/16/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - PARTIAL, Spread footings for patio ok for concrete placement. } ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - PA. House only; porch columns remain to be inspected.} ; {Activity date: 12/06/2021; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - pa Perimeter footing, along with 3 - 3’ column footings ok to pour. Center slab column footing not yet ready.} |
|
| 11/10/2022 | RSBU - Building Final | Passed | ||
| 11/10/2022 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/10/2022 | RSME - Mechanical Progress | Passed | ||
| 11/15/2022 | COT - RSME - Mechanical Final | Passed | ||
| 11/15/2022 | COT - RSPL - Plumbing Final | Passed | ||
| 11/15/2022 | COT - RSEL - Electrical Final | Passed |