Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/07/2021
Applicant:
Description:
GUEST HOUSE

Permit Reviews

Permit Number - T21CM07215
Permit Status: Complete
Permit Description: GUEST HOUSE
Start Date Submittal Complete Date Status  
09/07/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 10/05/2021 COMPLETED Review Details
11/15/2021 RESUBMITTAL 11/16/2021 COMPLETED Review Details
11/16/2021 RESUBMITTAL 11/29/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM07215
Permite Description: GUEST HOUSE
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/10/2022 COT - RSME - Mechanical Final N/A Re-inspection required Install ultraviolet protection for linesets.
11/10/2022 COT - RSPL - Plumbing Final N/A Re-inspection required 1-Bathroom lag drain has negative slope. 2-Install hammer arrest or for dishwasher.
11/10/2022 COT - RSEL - Electrical Final N/A Re-inspection required Install properly sized breaker for AC compressor disconnect per nameplate.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM07215
Permit Description: GUEST HOUSE
Total Completed Inspections - 20
Date Description Inspector Results Comments
12/06/2021 COT - RSEL - Grounding/Bonding Passed {Activity date: 12/06/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap}
02/11/2022 COT - RSBU - Masonry Pregrout Passed {Activity date: 02/11/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 01/27/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. 2nd lift. 4 to 8 feet.} ; {Activity date: 01/13/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. 1st lift of 4 feet.}
03/11/2022 COT - RSBU - Roof Nailing Passed {Activity date: 03/11/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
03/11/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 03/11/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
03/23/2022 COT - RSEL - Electrical Underground Passed {Activity date: 03/23/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
04/01/2022 COT - RSPL - Yard Water Line Passed {Activity date: 04/01/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap
Ok to backfill}
04/06/2022 COT - RSPL - Rough Soil Passed {Activity date: 04/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. From under slab to clay house piping.} ; {Activity date: 12/27/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - PA. Under slab.}
08/16/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/01/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - PARTIAL APPROVAL FOR ELECTRICAL ONLY} ; {Activity date: 06/29/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -DE. 1-Obtain 3035 inspection approval. 2-Obtain 1035 inspection approval. 3-Provide 30” of clearance in front of all junction boxes. 4- Complete electrical rough in. 5-Bond exposed metal post with electron it. 6- Seal all fire blocks. 7-Complete Mechanical rough in.
}
08/16/2022 COT - LCBU - Framing Passed {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/01/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval please install studs in center bearing wall add 24 inch on center please install plate anywhere where would touch his concrete} ; {Activity date: 03/11/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready.}
08/16/2022 COT - RSBU - Preslab Passed {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -PA. House only; columns and Porch remain to be inspected.}
08/16/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/01/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval no DWV TEST POTABLE WATER IS OK

} ; {Activity date: 06/29/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -DE. Provide test for DWV piping.}
08/16/2022 COT - RSEL - Construction Power Passed {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved ok for clearance INCR}
08/16/2022 BULD - Electrical Clearance Passed {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - CODE INCR}
08/16/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - PARTIAL, Spread footings for patio ok for concrete placement.
} ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - PA. House only; porch columns remain to be inspected.} ; {Activity date: 12/06/2021; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - pa
Perimeter footing, along with 3 - 3’ column footings ok to pour.
Center slab column footing not yet ready.}
11/10/2022 RSBU - Building Final Passed
11/10/2022 COT - RSEL - Outdoor Lighting Passed
11/10/2022 RSME - Mechanical Progress Passed
11/15/2022 COT - RSME - Mechanical Final Passed
11/15/2022 COT - RSPL - Plumbing Final Passed
11/15/2022 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
ADDRESS RECEIPT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
C OF O T21CM07215.PDF CERT OF OCC VIEW