Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM06853
Permit Details
Apply Date:
08/23/2021
Applicant:
Lisa Bowers
Description:
Enclose Porch
Permit Reviews
Permit Number - T21CM06853
Permit Status: Issued
Permit Description: Enclose Porch
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/23/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 09/13/2021 | COMPLETED |
09/17/2021 | RESUBMITTAL | 10/05/2022 | COMPLETED |
10/05/2022 | RESUBMITTAL | 10/17/2022 | COMPLETED |
10/19/2022 | RESUBMITTAL | 10/20/2022 | ACTIVE |
10/28/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/15/2022 | APPROVED |
Conditions
Permit Number - T21CM06853
Permit Status: Issued
Permit Description: Enclose Porch
Date | Description | Comments |
---|---|---|
11/29/2022 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM06853
Permit Description: Enclose Porch
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/06/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | rebar is properly placed per plans. sewer line is wrapped going through footing pour. | |
02/06/2023 | COT - RSPL - Rough Soil | Passed | sewer line is installed with 2 clean-outs and proper slope for drainage | |
02/13/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/13/2023 | COT - RSBU - Preslab | Passed | N/A subfloor walk deck. no concrete slab, only stem walls. |
|
02/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and Sheetrock. | |
03/10/2023 | COT - RSPL - Plumbing Final | Passed | ||
03/10/2023 | COT - RSEL - Electrical Final | Passed | ||
03/10/2023 | COT - RSME - Mechanical Final | Passed | ||
03/10/2023 | RSBU - Building Final | Passed |