Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Apply Date:
08/12/2021
Applicant:
Titan Solar Power
Description:
Installation of roof mounted 11.1kW photovoltaic system and a main breaker derate to 150A
Contractors:
  • Titan Solar Power

Completed Inspections

Permit Status: Final
Permit Number: T21CM06544
Permit Description: Installation of roof mounted 11.1kW photovoltaic system and a main breaker derate to 150A
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/17/2021 TEP CLEARANCE - PM TLUNDBERG Approved CODE DGC
12/17/2021 ELECTRIC - FINAL TLUNDBERG Approved AP
TEP DGC
12/17/2021 BUILDING - FINAL TLUNDBERG Approved AP

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 LOAD CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION1 LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET REV1.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
REV1 APPLICATION.PDF DOCUMENTS VIEW
REV1 JOB CARD.PDF DOCUMENTS VIEW
REV1 LOAD CALCS.PDF DOCUMENTS VIEW
REV1 PERMIT.PDF DOCUMENTS VIEW
REVISION1 LETTER.PDF DOCUMENTS VIEW