Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3540 S KINO PW
Apply Date:
07/30/2021
Applicant:
Description:
New Construction of a 5200 SF Convenience Store with associated 5547 SF Fuel Canopy

Permit Reviews

Permit Number - T21CM06223
Permit Status: Complete
Permit Description: New Construction of a 5200 SF Convenience Store with associated 5547 SF Fuel Canopy
Start Date Submittal Complete Date Status  
04/11/2022 3RD PARTY REVIEW - COMMERCIAL 05/31/2022 COMPLETED Review Details
07/30/2021 3RD PARTY REVIEW - COMMERCIAL 02/25/2022 COMPLETED Review Details
08/17/2022 REVISION - - 1ST 09/22/2022 COMPLETED Review Details
02/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/28/2023 APPROVED Review Details

Conditions

Permit Number - T21CM06223
Permit Status: Complete
Permit Description: New Construction of a 5200 SF Convenience Store with associated 5547 SF Fuel Canopy
Date Description Comments
02/25/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/25/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
02/25/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
02/25/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
02/25/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/25/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
02/25/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/25/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
02/25/2022 SPECIAL INSPECTION IS REQUIRED FOR STRUCTURAL STEEL.
02/25/2022 SHOP DRAWINGS REQUIRED FOR SIGNAGE.
02/25/2022 SHOP DRAWINGS REQUIRED FOR WOOD TRUSSES.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM06223
Permite Description: New Construction of a 5200 SF Convenience Store with associated 5547 SF Fuel Canopy
Total Outstanding Inspections - 27
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCPL - Gas Pressure Test N/A Not Ready
10/26/2022 COT - LCME - Mechanical Underground N/A Not Ready
10/26/2022 COT - LCME - Mechanical Progress N/A Not Ready
10/26/2022 COT - LCPL - Medical Gas Preconstruction Mtg N/A Not Ready
10/26/2022 COT - LCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - LCBU - Sustainability N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCPL - Sewer N/A Not Ready
10/26/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Not Ready
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Progress N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - LCEL - Outdoor Lighting N/A Not Ready
11/29/2022 COT - LCEL - Electrical Progress N/A Partial Pass partial approval for 8 light pole bases
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - LCBU - Masonry Pregrout N/A Not Ready
01/24/2023 COT - LCPL - Plumbing Final N/A Not Ready
01/24/2023 COT - LCEL - Construction Power N/A Not Ready
01/24/2023 COT - LCME - Mechanical Final N/A Not Ready
01/25/2023 COT - LCEL - Electrical Final N/A Not Ready
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
10/26/2022 COT - HCBU - Exterior Clips/Sheathing N/A Not Ready
01/24/2023 COT - LCBU - Building Above Ceiling N/A Partial Pass recall when tiles installed
10/27/2022 COT - LCBU - Building Final N/A Not Ready
COT - FCON - Fire - Final N/A Not Ready Need co2 company to call in their permit for the co2 detection system

Completed Inspections

Permit Status: Complete
Permit Number: T21CM06223
Permit Description: New Construction of a 5200 SF Convenience Store with associated 5547 SF Fuel Canopy
Total Completed Inspections - 19
Date Description Inspector Results Comments
08/10/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 08/10/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved}
09/26/2022 COT - LCBU - Roof Nailing Passed {Activity date: 09/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved
}
10/04/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
10/04/2022 COT - LCBU - Framing Passed {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to insulate and cover walls} ; {Activity date: 09/26/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for shell/ wood frame

}
10/04/2022 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
10/04/2022 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
10/05/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 10/05/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/30/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for grease trap wet test, ok to back fill

}
11/21/2023 COT - FCON - Tank - Final Passed
12/15/2022 COT - LCME - Mechanical Above Ceiling Passed
12/23/2022 COT - LCBU - Masonry Pregrout Passed 3rd party inspection
01/24/2023 COT - LCEL - Electrical Above Ceiling Passed
01/24/2023 COT - HCME - Mechanical Above Ceiling Passed
01/25/2023 BULD - Electrical Clearance Passed
03/06/2023 COT - HCBU - Interior Shear Bracing Passed
03/06/2023 COT - HCBU - Exterior Clips/Sheathing Passed
03/06/2023 COT - LCBU - Building Above Ceiling Passed
03/06/2023 COT - LCBU - Building Final Passed recommended for C/O
03/09/2023 COT - FCON - Alarm - Final Passed
03/09/2023 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
BOND EXEMPTION CERT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ENERGY_ELECT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ENERGY_ENVELOPE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ENERGY_MECH 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
FIRE FLOW ANALYSIS RESULTS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEOTECH 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 6223 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MAIL - DORIS BENOIT - OUTLOOK 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECH CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 6223 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PSA 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_TRUSS DRAWINGS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_TRUSSES 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUC CALCS BUILDING 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUC CALCS CANOPY 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SUBMITTAL 010 - TRUSS-JOISTS - REVIEWED 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
WATER MODEL SUMMARY FINAL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
BOND EXEMPTION CERT.PDF DOCUMENTS VIEW
ENERGY_ELECT.PDF DOCUMENTS VIEW
ENERGY_ENVELOPE.PDF DOCUMENTS VIEW
ENERGY_MECH.PDF DOCUMENTS VIEW
FIRE FLOW ANALYSIS RESULTS.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
JOB CARD 6223.PDF DOCUMENTS VIEW
MAIL - DORIS BENOIT - OUTLOOK.PDF DOCUMENTS VIEW
MECH CALCS.PDF DOCUMENTS VIEW
PERMIT 6223.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
PSA.PDF DOCUMENTS VIEW
REV1_TRUSS DRAWINGS.PDF DOCUMENTS VIEW
REV1_TRUSSES.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
STRUC CALCS BUILDING.PDF DOCUMENTS VIEW
STRUC CALCS CANOPY.PDF DOCUMENTS VIEW
SUBMITTAL #010 - TRUSS-JOISTS - REVIEWED.PDF DOCUMENTS VIEW
WATER MODEL SUMMARY FINAL.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CIRCLE K - 3450 S KINO -TAB REPORT-1-2023-02-13_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTION REPORTS KINO - TUCSON_V1.PDF DOCUMENTS VIEW