Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
07/27/2021
Applicant:
Description:
(T21DV01854) Convert SFR to Duplex

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM06090
Permite Description: (T21DV01854) Convert SFR to Duplex
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T21CM06090
Permit Description: (T21DV01854) Convert SFR to Duplex
Total Completed Inspections - 12
Date Description Inspector Results Comments
03/18/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 03/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Southwest gas clearance is required.}
03/18/2022 COT - LCBU - Framing Passed {Activity date: 03/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Southwest gas clearance is required.}
03/18/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 03/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Southwest gas clearance is required.}
03/18/2022 COT - BULD - SWG Clearance Passed {Activity date: 03/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - CODE}
03/18/2022 COT - RSPL - Rough Soil Passed {Activity date: 03/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Southwest gas clearance is required.}
03/18/2022 RSME - Mechanical Progress Passed {Activity date: 03/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Southwest gas clearance is required.}
03/18/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 03/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Southwest gas clearance is required.}
08/01/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 08/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - CODE INCR}
08/01/2022 COT - RSEL - Service Upgrade Passed {Activity date: 08/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. The TEP clearance code is INCR.

} ; {Activity date: 03/18/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Not ready.}
09/01/2022 COT - RSBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 09/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/01/2022 RSBU - Building Final Passed {Activity date: 09/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/24/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval fire barrier not complete
}
09/01/2022 COT - RSEL - Electrical Final Passed {Activity date: 09/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/24/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval require gfi on washer
}

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW