Permit: T21CM05776
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
6601 S 10TH AV
Address NEW:
6601 S 10TH AV
Apply Date:
07/15/2021
Applicant:
Luz Wierzbinski
Description:
Single-family residence
Permit Reviews
Permit Number - T21CM05776
Permit Status: Issued
Permit Description: Single-family residence
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/27/2022 | RESUBMITTAL | 06/15/2022 | COMPLETED |
| 07/15/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 08/10/2021 | COMPLETED |
| 07/21/2022 | RESUBMITTAL | 07/25/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T21CM05776
Permit Status: Issued
Permit Description: Single-family residence
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 07/15/2021 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 07/25/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm |
| 07/25/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM05776
Permite Description: Single-family residence
Total Outstanding Inspections - 19
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 06/06/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 06/06/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 06/06/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | |
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | COT - LCBU - Framing | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Construction Power | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready |