Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
857 W 26TH ST
Apply Date:
07/14/2021
Applicant:
Al Gastelum
Description:
SFR

Permit Reviews

Permit Number - T21CM05754
Permit Status: Issued
Permit Description: SFR
Start Date Submittal Complete Date Status  
02/04/2022 RESUBMITTAL 03/18/2022 COMPLETED Review Details
07/14/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 08/19/2021 COMPLETED Review Details
08/04/2022 RESUBMITTAL 08/23/2022 COMPLETED Review Details
12/06/2021 RESUBMITTAL 02/01/2022 COMPLETED Review Details
01/30/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2023 APPROVED Review Details

Conditions

Permit Number - T21CM05754
Permit Status: Issued
Permit Description: SFR
Date Description Comments
08/09/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
08/04/2022 Prior to permit issuance a General Contractor Letter (GCL) is required

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM05754
Permite Description: SFR
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - RSBU - Preslab N/A Not Ready
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready
01/20/2023 COT - LCBU - Framing N/A Partial Pass awaiting intermediate inspections
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
10/27/2022 RSME - Mechanical Progress N/A Not Ready
10/26/2022 COT - RSPL - Gas Pressure Test N/A Not Ready
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
05/03/2024 BULD - Electrical Clearance N/A Not Applicable
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/30/2024 RSBU - Building Final N/A Partial Pass Roof system needs to be completed.
05/03/2024 COT - RSME - Mechanical Final N/A Re-inspection required 5/3/24: properly secure electrical whip at A/C unit, condensate drain must be UV protected,
05/03/2024 COT - RSEL - Electrical Final N/A Re-inspection required 5/3/24: GFCI at garage missing, Arc-fault breaker's missing at multiple locations, Receptacle for dishwasher must be moved (needs to be accessible). Light fixtures on exterior of home must be installed.
COT - FCON - Sprinkler - Final N/A Not Ready Didn't install sprinkler system yet.
10/26/2022 COT - FCON - Fire - Final N/A Not Ready Waiting for sprinkler system.
10/26/2022 COT - RSPL - Sewer N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T21CM05754
Permit Description: SFR
Total Completed Inspections - 15
Date Description Inspector Results Comments
10/18/2022 COT - RSPL - Rough Soil Passed {Activity date: 10/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to cover

}
01/20/2023 COT - RSBU - Exterior Clips/Sheathing Passed
01/20/2023 COT - RSBU - Roof Nailing Passed
05/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/05/2023 COT - LCBU - Framing Passed
05/05/2023 COT - LCPL - Plumbing Intermediate Passed
05/05/2023 RSME - Mechanical Progress Passed
05/05/2023 COT - RSPL - Gas Pressure Test Passed
10/25/2023 COT - RSPL - Yard Water Line Passed
01/11/2024 COT - RSEL - Electrical Underground Passed 1/11/24: Electrical underground from main panel to sub panel per plan. Ok to backfill.
10/30/2024 COT - RSEL - Outdoor Lighting Passed
10/30/2024 COT - RSME - Mechanical Final Passed
10/30/2024 COT - RSEL - Electrical Final Passed
10/30/2024 COT - RSPL - Plumbing Final Passed
10/30/2024 COT - RSPL - Sewer Passed

Scheduled Inspections

Scheduled Inspections - T21CM05754
Status: Issued
Description: SFR
Scheduled Date Description Entered By Entered Date
10/30/2024 COT - FCON - Fire - Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MODEL FIRE FLOW LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
OBW 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
MODEL FIRE FLOW LETTER.PDF DOCUMENTS VIEW
OBW.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
R73795665.J2204010A_V1.PDF DOCUMENTS VIEW
RASCON RES LAYOUT_V1.PDF DOCUMENTS VIEW