Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
07/06/2021
Applicant:
Aaron Knepper
Description:
New 256 unit apartment complex. There are 18 buildings. Each building assigned a separate permit. Bl

Permit Reviews

Permit Number - T21CM05524
Permit Status: Inspections
Permit Description: New 256 unit apartment complex. There are 18 buildings. Each building assigned a separate permit. Bl
Start Date Submittal Complete Date Status  
02/10/2022 RESUBMITTAL 03/04/2022 COMPLETED Review Details
07/06/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 08/06/2021 COMPLETED Review Details
08/25/2021 RESUBMITTAL 09/28/2021 COMPLETED Review Details
11/01/2021 RESUBMITTAL 02/10/2022 COMPLETED Review Details
07/25/2023 COMMERCIAL REVIEW - FULL v.1 08/21/2023 REQUIRES RESUBMIT Review Details
07/23/2025 COMMERCIAL REVIEW - FULL REVISION v.1 08/13/2025 APPROVED Review Details
09/27/2024 COMMERCIAL REVIEW - FULL v.2 10/11/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - T21CM05524
Permit Status: Inspections
Permit Description: New 256 unit apartment complex. There are 18 buildings. Each building assigned a separate permit. Bl
Total Outstanding Activity Conditions - 13
Date Name
07/23/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
07/23/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/23/2025 SHOP DRAWINGS REQUIRED FOR CARPORT STRUCTURE Designs must be submitted and approved prior to final.
07/23/2025 SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED RAMADAS Designs must be submitted and approved prior to final.
07/23/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/23/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
07/23/2025 Separate TFD permits are required for: Fire Alarm System
07/23/2025 Separate TFD permits are required for: Fire Sprinkler System
07/23/2025 SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED.
07/23/2025 Stair Designs must be submitted and approved prior to...
07/23/2025 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
07/23/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
07/23/2025 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.

Conditions

Permit Number - T21CM05524
Permit Status: Inspections
Permit Description: New 256 unit apartment complex. There are 18 buildings. Each building assigned a separate permit. Bl
Date Description Comments
02/18/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Inspections
Permit Number: T21CM05524
Permite Description: New 256 unit apartment complex. There are 18 buildings. Each building assigned a separate permit. Bl
Total Outstanding Inspections - 45
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - LCBU - Building Above Ceiling N/A Canceled Inspection Canceled
11/04/2022 COT - LCEL - Electrical Progress N/A Canceled Inspection Canceled
11/04/2022 PDSD Site/Engineering Division - Landscaping N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Building Final N/A Canceled Inspection Canceled
11/04/2022 COT - LCEL - Electrical Intermediate N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Framing N/A Canceled Inspection Canceled
11/04/2022 COT - LCEL - Electrical Underground N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Plumbing Progress N/A Canceled Inspection Canceled
11/04/2022 COT - LCME - Mechanical Above Ceiling N/A Canceled Inspection Canceled
11/04/2022 COT - LCME - Mechanical Progress N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Plumbing Roof Drains N/A Canceled Inspection Canceled
11/04/2022 COT - LCEL - Outdoor Lighting N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Preslab N/A Canceled Inspection Canceled
11/04/2022 PDSD Site/Engineering Division - NPPO N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Plumbing Intermediate N/A Canceled Inspection Canceled
11/04/2022 TRSP - ROW - Final/Close-Out N/A Canceled Inspection Canceled
11/04/2022 COT - FCON - Alarm - Final N/A Canceled Inspection Canceled
11/04/2022 COT - LCEL - Electrical Final N/A Canceled Inspection Canceled
11/04/2022 ENGR Engineering Final N/A Canceled Inspection Canceled
11/04/2022 COT - FCON - Sprinkler - Final N/A Canceled Inspection Canceled
11/04/2022 COT - HCBU - Exterior Clips/Sheathing N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Exterior Clips/Sheathing N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Plumbing Above Ceiling N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Sustainability N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Rough Soil N/A Canceled Inspection Canceled
11/04/2022 COT - FCON - Fire - Final N/A Canceled Inspection Canceled
11/04/2022 COT - LCEL - Electrical Above Ceiling N/A Canceled Inspection Canceled
11/04/2022 PDSD Building Division - Sign Final N/A Canceled Inspection Canceled
11/04/2022 COT - LCME - Mechanical Intermediate N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Roof Nailing N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Building Progress N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Sewer N/A Canceled Inspection Canceled
11/04/2022 COT - HCBU - Interior Shear Bracing N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Backwater Valve N/A Canceled Inspection Canceled
11/07/2022 COT - LCME - Mechanical Final N/A Canceled Inspection Canceled
11/07/2022 COT - LCPL - Plumbing Final N/A Canceled Inspection Canceled
10/03/2025 COT - HCPL - Sewer N/A Not Ready Wanted pre-slab, but it did not get to me. Ok to pour.
09/25/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Not Ready wanted building 1
09/25/2025 COT - HCEL - Electrical Underground N/A Not Ready Wanted building 1
09/25/2025 COT - HCBU - Preslab N/A Not Ready
09/25/2025 COT - HCEL - Grounding/Bonding N/A Not Ready Wanted building 1
11/19/2025 COT - HCBU - Framing N/A Partial Pass Floor deck nailing
10/06/2025 COT - HCPL - Yard Water Line N/A Partial Pass

Completed Inspections

Permit Status: Inspections
Permit Number: T21CM05524
Permit Description: New 256 unit apartment complex. There are 18 buildings. Each building assigned a separate permit. Bl
Total Completed Inspections - 6
Date Description Inspector Results Comments
09/08/2025 COT - HCPL - Rough Soil Passed Okay to backfill all progress areas. Shading required. 9/8/2025
09/16/2025 FCON – Fire – Intermediate Passed Riser sweep inspection.
10/06/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
10/06/2025 COT - HCEL - Electrical Underground Passed
10/06/2025 COT - HCBU - Preslab Passed
10/06/2025 COT - HCEL - Grounding/Bonding Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW