Permit: T21CM05449
Permit Details
Status:
In Revision
Type:
Commercial Building
Address:
2945 N BEAR CANYON RD
Address NEW:
2945 N BEAR CANYON RD
Apply Date:
07/02/2021
Applicant:
Jim Morrison
Description:
New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
Permit Reviews
Permit Number - T21CM05449
Permit Status: In revision
Permit Description: New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2025 | COMMERCIAL REVIEW - FULL v.2 | 10/14/2025 | APPROVED |
| 09/24/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/25/2026 | APPROVED |
| 09/27/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/11/2024 | REQUIRES RESUBMIT |
| 07/23/2025 | COMMERCIAL REVIEW - FULL v.1 | 08/13/2025 | REQUIRES RESUBMIT |
| 11/16/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | N/A | IN REVIEW |
| 10/11/2024 | RESTAMP - COMMERCIAL v.1 | 10/14/2024 | APPROVED |
| 07/21/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/21/2023 | REQUIRES RESUBMIT |
| 10/14/2025 | RESTAMP - COMMERCIAL v.1 | 10/16/2025 | APPROVED |
| 11/02/2026 | SPECIAL INSPECTION REVIEW v.1 | 11/03/2026 | APPROVED |
| 10/16/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/19/2026 | APPROVED |
| 05/07/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 05/29/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM05449
Permit Status: In revision
Permit Description: New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/09/2025 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR AUTOMATIC FIRE SPRINKLERS. |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR CARPORT STRUCTURE. |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR FIRE ALARM MONITORING. |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED RAMADAS. |
Conditions
Permit Number - T21CM05449
Permit Status: In revision
Permit Description: New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
| Date | Description | Comments |
|---|---|---|
| 02/18/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 07/09/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED WOOD TRUSSES. | |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR STEEL STAIRS. | |
| 07/09/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 07/09/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 07/09/2025 | SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED. | |
| 07/09/2025 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 07/09/2025 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: T21CM05449
Permite Description: New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
Total Outstanding Inspections - 46
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - LCPL - Gas Pressure Test | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Building Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Framing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Underground | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Mechanical Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Mechanical Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Firewall/Fire Barrier/Firestop | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Roof Drains | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Kitchen Hood | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Outdoor Lighting | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | Pool/Spa - Electric | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Preslab | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | Pool/Spa - Bonding Grip | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Exterior Clips/Sheathing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Sustainability | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Rough Soil | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Mechanical Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Roof Nailing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Building Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | Pool/Spa - Heater | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Sewer | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | Pool/Spa - Plumbing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - HCBU - Interior Shear Bracing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Backwater Valve | N/A | Canceled | Inspection Canceled |
| 12/17/2025 | COT - HCME - Kitchen Hood | N/A | Not Applicable | |
| 12/17/2025 | COT - HCME - Venting | N/A | Not Applicable | |
| 12/17/2025 | Pool/Spa - Final/Barrier | N/A | Not Applicable | part of pool permit |
| 09/26/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Pre-slab. |
| 02/03/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Not Applicable | |
| 12/04/2025 | COT - HCBU - Framing | N/A | Not Ready | Complete MEP rough in's and dry in. |
| 12/04/2025 | COT - HCPL - Yard Water Line | N/A | Partial Pass | building entry |
| 09/21/2026 | TRSP - ROW - Notice of Completion | N/A | Re-inspection required | |
| 09/17/2026 | COT - HCPL - Backwater Valve | N/A | Not Applicable | |
| 10/14/2026 | COT - HCBU - TCO | N/A | Partial Pass | OK for Level Four. |
| 10/30/2026 | COT - LCBU - Building Final | N/A | Partial Pass | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED. SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED RAMADAS. SHOP DRAWINGS REQUIRED FOR FIRE ALARM MONITORING. SHOP DRAWINGS REQUIRED FOR AUTOMATIC FIRE SPRINKLERS. SHOP DRAWINGS REQUIRED FOR CARPORT STRUCTURE. SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 10/29/2026 | COT - LCEL - Electrical Final | N/A | Re-inspection required | Clear permit conditions. |
| 10/29/2026 | COT - LCME - Mechanical Final | N/A | Re-inspection required | clear permit conditions |
| 10/29/2026 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | Clear permit conditions. |
| 10/30/2026 | ENGR Engineering Final | N/A | Partial Pass | Okay to apply for level 4 TCO |
Completed Inspections
Permit Status: In Revision
Permit Number: T21CM05449
Permit Description: New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
Total Completed Inspections - 24