Permit: T21CM05449
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
2945 N BEAR CANYON RD
Address NEW:
2945 N BEAR CANYON RD
Apply Date:
07/02/2021
Applicant:
Aaron Knepper
Description:
New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
Permit Reviews
Permit Number - T21CM05449
Permit Status: Issued
Permit Description: New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2022 | RESUBMITTAL | 03/04/2022 | COMPLETED |
| 07/02/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 08/16/2021 | COMPLETED |
| 08/25/2021 | RESUBMITTAL | 09/28/2021 | COMPLETED |
| 11/01/2021 | RESUBMITTAL | 02/10/2022 | COMPLETED |
| 09/24/2025 | COMMERCIAL REVIEW - FULL v.2 | 10/14/2025 | APPROVED |
| 09/27/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/11/2024 | REQUIRES RESUBMIT |
| 07/23/2025 | COMMERCIAL REVIEW - FULL v.1 | 08/13/2025 | REQUIRES RESUBMIT |
| 10/11/2024 | RESTAMP - COMMERCIAL v.1 | 10/14/2024 | APPROVED |
| 07/21/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/21/2023 | REQUIRES RESUBMIT |
| 10/14/2025 | RESTAMP - COMMERCIAL v.1 | 10/16/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM05449
Permit Status: Issued
Permit Description: New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
Total Outstanding Activity Conditions - 13
| Date | Name |
|---|---|
| 07/09/2025 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 07/09/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR AUTOMATIC FIRE SPRINKLERS. |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR CARPORT STRUCTURE. |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR FIRE ALARM MONITORING. |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED RAMADAS. |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED WOOD TRUSSES. |
| 07/09/2025 | SHOP DRAWINGS REQUIRED FOR STEEL STAIRS. |
| 07/09/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/09/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 07/09/2025 | SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED. |
| 07/09/2025 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
| 07/09/2025 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Conditions
Permit Number - T21CM05449
Permit Status: Issued
Permit Description: New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
| Date | Description | Comments |
|---|---|---|
| 02/18/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM05449
Permite Description: New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
Total Outstanding Inspections - 42
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - LCPL - Gas Pressure Test | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Building Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Building Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Framing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Underground | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Mechanical Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Mechanical Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Firewall/Fire Barrier/Firestop | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Roof Drains | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Kitchen Hood | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Outdoor Lighting | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | Pool/Spa - Electric | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Preslab | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - FCON - Alarm - Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | Pool/Spa - Bonding Grip | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Exterior Clips/Sheathing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Sustainability | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Rough Soil | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - FCON - Fire - Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Mechanical Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Roof Nailing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Building Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | Pool/Spa - Heater | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Sewer | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | Pool/Spa - Plumbing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - HCBU - Interior Shear Bracing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Backwater Valve | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | Pool/Spa - Final/Barrier | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCME - Mechanical Final | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCPL - Plumbing Final | N/A | Canceled | Inspection Canceled |
| COT - FCON - Sprinkler - Final | N/A | Not Ready | This permit was called in on accident. | |
| 09/26/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Pre-slab. |
| 12/04/2025 | COT - HCBU - Framing | N/A | Not Ready | Complete MEP rough in's and dry in. |
| 12/04/2025 | COT - HCPL - Yard Water Line | N/A | Partial Pass | building entry |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM05449
Permit Description: New 256 unit apartment complex. There are 18 buildings.Each building has been assigned a separate pe
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2025 | COT - HCPL - Rough Soil | Passed | community building | |
| 09/16/2025 | FCON – Fire – Intermediate | Passed | Riser sweep inspection. | |
| 12/04/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 12/04/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 12/04/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 12/04/2025 | COT - HCEL - Grounding/Bonding | Passed | ||
| 12/04/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 12/04/2025 | COT - HCBU - Preslab | Passed |