Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
3319 E GLENN ST
Address NEW:
3319 E GLENN ST
Apply Date:
06/25/2021
Applicant:
Cyrus Moore
Description:
NEW SFR

Permit Reviews

Permit Number - T21CM05290
Permit Status: Issued
Permit Description: NEW SFR
Start Date Submittal Complete Date Status  
06/25/2021 3RD PARTY REVIEW - RESIDENTIAL 08/16/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM05290
Permit Status: Issued
Permit Description: NEW SFR
Total Outstanding Activity Conditions - 2
Date Name
08/05/2021 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
08/05/2021 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Conditions

Permit Number - T21CM05290
Permit Status: Issued
Permit Description: NEW SFR
Date Description Comments
06/25/2021 SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
06/25/2021 FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
06/25/2021 FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
08/04/2021 FUP T21OT00568 MUST BE PAID BEFORE FINAL INSPECTIONS.
08/04/2021 FUP T21OT00568 MUST BE PAID BEFORE FINAL INSPECTIONS.

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM05290
Permite Description: NEW SFR
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/02/2022 COT - RSEL - Electrical Underground N/A Canceled {Activity date: 06/02/2022; Status: Not Applicable; Inspector: DQUINN; Comment: Entered by NGARCIA3 - na}
07/25/2022 COT - RSEL - Service Upgrade N/A Canceled {Activity date: 07/25/2022; Status: Not Applicable; Inspector: DQUINN; Comment: Entered by VVERA1 - na} ; {Activity date: 06/02/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Nr
Need ufer and arc faults}

Completed Inspections

Permit Status: Issued
Permit Number: T21CM05290
Permit Description: NEW SFR
Total Completed Inspections - 20
Date Description Inspector Results Comments
08/25/2021 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/25/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by RSALDAT1 - AP} ; {Activity date: 08/20/2021; Status: Cancelled; Inspector: RELEFANTE; Comment: Entered by VVERA1 - Contractor wanted to cancel because he is moving his daughter today}
08/25/2021 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/25/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by RSALDAT1 - AP}
10/15/2021 COT - RSBU - Preslab Passed {Activity date: 10/15/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
10/15/2021 COT - RSPL - Rough Soil Passed {Activity date: 10/15/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
12/09/2021 COT - RSBU - Roof Nailing Passed {Activity date: 12/09/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - ) Ap}
12/09/2021 COT - LCBU - Framing Passed {Activity date: 12/09/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - ) Ap}
12/09/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 12/09/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - ) Ap}
01/19/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 01/19/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
01/19/2022 COT - RSBU - Sustainability Passed {Activity date: 01/19/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
01/19/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 01/19/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
04/28/2022 COT - RSPL - Sewer Passed {Activity date: 04/28/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
04/28/2022 RSPL - Plumbing Progress Passed {Activity date: 04/28/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap
Main 3" abs exiting building is above grade for 30’ before dropping to an appropriate depth for back filling. Builder is bringing in 6 tons of dirt to build up the yard height in the pipe area, to provide well compacted 12" of cover.}
06/02/2022 COT - RSME - Mechanical Final Passed {Activity date: 06/02/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
06/02/2022 COT - RSPL - Plumbing Final Passed {Activity date: 06/02/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap} ; {Activity date: 08/05/2021; Status: Prior to Final Inspectn; Inspector: ARUIZ; Comment: Entered by ARUIZ1 - ISSUED PERMIT PRIOR TO WASTE WATER RECEIPT /PERMIT. CONFIRM WASTE WATER BEFORE MOVING FORWARD.}
06/02/2022 RSEL - Electrical Progress Passed {Activity date: 06/02/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
06/02/2022 RSME - Mechanical Progress Passed {Activity date: 06/02/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
06/02/2022 RSBU - Building Progress Passed {Activity date: 06/02/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
06/09/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 06/09/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - CODE INCR}
07/25/2022 RSBU - Building Final Passed {Activity date: 07/25/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - APPROVED BY INSPECTOR AWAITING CONDITIONS
} ; {Activity date: 07/25/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} ; {Activity date: 07/15/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA
I left a message in the morning, no return call. I stopped at site at 12:00pm and the gate was locked. I stopped again at 2:45 and the gate was locked. NO ACCESS.} ; {Activity date: 06/02/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa
Need elec final only for 1090 approval and eco approval.
}
07/25/2022 COT - RSEL - Electrical Final Passed {Activity date: 07/25/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap

Close permit} ; {Activity date: 06/09/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for clearance INCR} ; {Activity date: 06/02/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by NGARCIA3 - nr}

Documents

File Name Document Type  
REQUEST FOR FOOTING INSP PRIOR TO SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SEWER CONNECTION FEE ASSESSMENT PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REQUEST FOR FOOTING INSP PRIOR TO SIC.PDF DOCUMENTS VIEW
SEWER CONNECTION FEE ASSESSMENT PERMIT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
ELEVATION CERT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW