Permit: T21CM05154
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2701 E WIEDING RD
Address NEW:
2701 E WIEDING RD
Apply Date:
06/21/2021
Applicant:
Keith Campbell
Description:
New Pre-Fab Metal Industrial Building
Permit Reviews
Permit Number - T21CM05154
Permit Status: Complete
Permit Description: New Pre-Fab Metal Industrial Building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/21/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 07/29/2021 | COMPLETED |
| 08/11/2021 | RESUBMITTAL | 09/01/2021 | COMPLETED |
| 10/12/2021 | RESUBMITTAL | 10/13/2021 | COMPLETED |
| 01/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/23/2024 | APPROVED |
| 10/23/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/02/2023 | APPROVED |
Conditions
Permit Number - T21CM05154
Permit Status: Complete
Permit Description: New Pre-Fab Metal Industrial Building
| Date | Description | Comments |
|---|---|---|
| 08/18/2021 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 08/18/2021 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
| 08/18/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 08/18/2021 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 08/18/2021 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 08/18/2021 | SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED METAL BUILDING |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM05154
Permite Description: New Pre-Fab Metal Industrial Building
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
| 01/09/2023 | COT - LCPL - Sewer | N/A | Canceled | cancelled duplicate inspection |
| 10/26/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | |
| 02/07/2023 | COT - LCPL - Plumbing Roof Drains | N/A | Not Applicable | |
| 02/07/2023 | COT - LCPL - Plumbing Progress | N/A | Not Applicable | |
| 01/09/2023 | COT - LCEL - Electrical Progress | N/A | Partial Pass | piping complete ready for backfill |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 01/24/2024 | COT - LCBU - Sustainability | N/A | Not Applicable | |
| 01/24/2024 | COT - LCBU - Building Final | N/A | Not Ready | 1/24/24: pending fire final and landscape/engineering final. |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM05154
Permit Description: New Pre-Fab Metal Industrial Building
Total Completed Inspections - 35
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 07/01/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
| 08/12/2022 | COT - LCEL - Electrical Underground | Passed | {Activity date: 08/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Riser room.} ; {Activity date: 07/07/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for underground feeders to building #2 and feeders to panels within building} | |
| 08/12/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Riser room.} ; {Activity date: 06/07/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, spread footings for building 2 columns ok for concrete placement.} ; {Activity date: 04/05/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready} | |
| 08/12/2022 | COT - LCBU - Preslab | Passed | {Activity date: 08/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Riser room.} ; {Activity date: 07/07/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial building #2 } ; {Activity date: 07/01/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - not ready.} |
|
| 10/12/2022 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 10/07/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Not ready. Provide access to the job site.} | |
| 10/12/2022 | COT - LCBU - Framing | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR, cancelled by Contractor } |
|
| 10/12/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 10/07/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Not ready. Provide access to the job site.} | |
| 11/18/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 01/13/2023 | COT - LCBU - Roof Nailing | Passed | Metal roof is completely screwed off. | |
| 01/13/2023 | COT - LCBU - Exterior Clips/Sheathing | Passed | metal panels are installed and screwed off per manufactures recommendation. | |
| 01/13/2023 | COT - LCPL - Sewer | Passed | septic tank and leach field are installed per plans and manufactures recommendations. ok to backfill trenches. | |
| 02/07/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 02/07/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 02/10/2023 | COT - LCME - Mechanical Intermediate | Passed | all mechanical equipment and ductwork are installed in office space. | |
| 02/10/2023 | COT - LCME - Mechanical Above Ceiling | Passed | all mechanical equipment and ductwork are installed in office space. | |
| 02/10/2023 | COT - LCME - Mechanical Progress | Passed | all mechanical equipment and ductwork are installed in office space. | |
| 02/15/2023 | COT - LCBU - Building Above Ceiling | Passed | Installation of mechanical, electrical, plumbing, and sprinkler system is complete. Okay to start installation of ceiling tiles in offices. | |
| 04/05/2023 | COT - LCBU - Building Progress | Passed | Framing for exterior electrical room is complete. Okay to install siding. Interior of building is complete, waiting on City to authorize water test on sprinkler system. | |
| 04/05/2023 | COT - HCPL - Yard Water Line | Passed | ||
| 04/05/2023 | COT - LCEL - Service Upgrade | Passed | ||
| 04/25/2023 | COT - LCEL - Electrical Progress | Passed | ||
| 12/04/2023 | BULD - Electrical Clearance | Passed | Approved 1600A service panel, 2 - ECO Clearances to TEP are required for unit #A and #B | |
| 01/24/2024 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 01/24/2024 | COT - FCON - Alarm - Final | Passed | ||
| 01/24/2024 | COT - LCPL - Backwater Valve | Passed | ||
| 01/24/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 01/24/2024 | PDSD Building Division - Sign Final | Passed | ||
| 01/24/2024 | COT - LCEL - Electrical Final | Passed | ||
| 01/24/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
| 01/24/2024 | COT - LCPL - Plumbing Final | Passed | ||
| 01/31/2024 | COT - FCON - Fire - Final | Passed | ||
| 02/07/2024 | PDSD Site/Engineering Division - Landscaping | Passed | Landscaping installed per plan | |
| 02/14/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 02/12/2024 | COT - LCBU - Building Final | Passed | 1/24/24: pending fire final and landscape/engineering final. 1/31/24: pending fire final and landscape/engineering final. 2/12/24: passed. |
|
| 02/12/2024 | ENGR Engineering Final | Passed |