Permit: T21CM05152
Permit Details
Apply Date:
06/21/2021
Applicant:
Keith Campbell
Description:
New Pre-Fab Metal Industrial Building
Permit Reviews
Permit Number - T21CM05152
Permit Status: Complete
Permit Description: New Pre-Fab Metal Industrial Building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/21/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 07/29/2021 | COMPLETED |
| 08/11/2021 | RESUBMITTAL | 09/01/2021 | COMPLETED |
| 10/12/2021 | RESUBMITTAL | 10/13/2021 | COMPLETED |
| 12/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/15/2023 | APPROVED |
| 12/12/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/12/2023 | REQUIRES RESUBMIT |
| 10/20/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/27/2023 | APPROVED |
Conditions
Permit Number - T21CM05152
Permit Status: Complete
Permit Description: New Pre-Fab Metal Industrial Building
| Date | Description | Comments |
|---|---|---|
| 08/18/2021 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 08/18/2021 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
| 08/18/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 08/18/2021 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 08/18/2021 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 08/18/2021 | SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED METAL BUILDING |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM05152
Permite Description: New Pre-Fab Metal Industrial Building
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCEL - Electrical Underground | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Preslab | N/A | Not Ready | |
| 06/01/2023 | COT - LCBU - Building Progress | N/A | Partial Pass | |
| 09/05/2023 | COT - LCEL - Electrical Final | N/A | Not Ready | |
| 12/15/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | FDC locking caps, knox box, fire extinguishers and riser/FACP signage. |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM05152
Permit Description: New Pre-Fab Metal Industrial Building
Total Completed Inspections - 31
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved. Building 4. Okay to backfill. Shading required. } ; {Activity date: 09/28/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by VVERA1 - NR} |
|
| 01/30/2023 | COT - LCBU - Roof Nailing | Passed | Roof panels are properly screwed to the purloins. | |
| 01/30/2023 | COT - LCBU - Exterior Clips/Sheathing | Passed | Exterior panels are properly screwed off on all framing members. | |
| 04/05/2023 | COT - LCBU - Framing | Passed | 4-5-23: Offices in building 4 framing complete. Okay to sheet rock other side. | |
| 04/05/2023 | COT - LCEL - Electrical Intermediate | Passed | Electrical rough in is complete | |
| 04/05/2023 | COT - LCPL - Plumbing Intermediate | Passed | 4-5-23: Plumbing rough in is complete. Okay to insulate and install sheet rock. | |
| 04/05/2023 | COT - HCBU - Interior Shear Bracing | Passed | 4-5-23: Offices in building 4 framing complete. Okay to sheet rock other side. | |
| 04/05/2023 | COT - LCPL - Plumbing Roof Drains | Passed | Roof gutters are complete and functional. | |
| 04/25/2023 | COT - LCPL - Plumbing Progress | Passed | ||
| 04/25/2023 | COT - LCME - Mechanical Intermediate | Passed | ||
| 04/25/2023 | COT - LCME - Mechanical Progress | Passed | ||
| 04/25/2023 | COT - LCEL - Electrical Progress | Passed | ||
| 05/30/2023 | COT - LCPL - Sewer | Passed | previously inspected and approved by RM, verified connection to septic tank | |
| 05/31/2023 | COT - HCEL - Electrical Underground | Passed | Approved from transformer pad to the building at 2636 E Ginter, okay to backfill progress areas | |
| 06/01/2023 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 06/01/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 06/01/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 06/01/2023 | COT - LCBU - Building Above Ceiling | Passed | ||
| 09/22/2023 | COT - LCEL - Service Upgrade | Passed | Two meters; 2636 E Ginter, Suite A, and 2636 E Ginter, Suite B. | |
| 09/06/2023 | BULD - Electrical Clearance | Passed | Approved for 3 phase service panel w/ 2 meters; ECO Clearance to TEP is required for 2636 E Ginter, Suite A and Suite B | |
| 12/01/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
| 12/01/2023 | COT - LCBU - Sustainability | Passed | ||
| 12/01/2023 | COT - LCBU - Building Progress | Passed | ||
| 12/04/2023 | COT - LCEL - Electrical Final | Passed | ||
| 12/14/2023 | COT - LCPL - Backwater Valve | Passed | ||
| 12/14/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 12/14/2023 | COT - LCME - Mechanical Final | Passed | ||
| 12/15/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 12/15/2023 | COT - LCBU - Building Final | Passed | ||
| 12/15/2023 | COT - FCON - Alarm - Final | Passed | ||
| 12/26/2023 | COT - FCON - Fire - Final | Passed |