Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Address:
3115 E LESTER ST
Address NEW:
3115 E LESTER ST
Apply Date:
06/21/2021
Applicant:
Net Zero Solar
Description:
Install 5.18 kW DC solar electric system, including ~6' of trenching.
Contractors:
  • Net Zero Solar
  • NET ZERO SOLAR LLC ***APA**

Permit Reviews

Permit Number - T21CM05140
Permit Status: Final
Permit Description: Install 5.18 kW DC solar electric system, including ~6' of trenching.
Start Date Submittal Complete Date Status  
06/21/2021 OTHER 07/19/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T21CM05140
Permit Description: Install 5.18 kW DC solar electric system, including ~6' of trenching.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/11/2021 TEP CLEARANCE - PM TGAUSP Approved CODE DGC
10/11/2021 ELECTRIC - FINAL TGAUSP Approved 1090 and 2090 are both Approved, please send DGC Clearance to TEP for solar meter
10/11/2021 BUILDING - FINAL TGAUSP Approved 1090 and 2090 are both Approved, please send DGC Clearance to TEP for solar meter

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CUT SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CUT SHEETS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW