Permit: T21CM05063
Permit Details
Apply Date:
06/17/2021
Applicant:
Doug Walkup / Brytemove Energy
Description:
· INSTALL ONE (1) CHARGEPOINT EXPRESS 250 FAST CHARGER AT THE GUEST PARKING. · INSTALL ONE (1) DUAL PORT L2 CHARGER AT THE GUEST PARKING. · INSTALL ONE (1) SINGLE PORT L2 CHARGER AT THE NEW VEHICLE DELIVERY AREA. · INSTALL TWO (2) ENEL X JUICEBOX 32A W/ NEMA PLUGS FOR THE SERVICE DEPARTMENT.
Architects:
- Raoul Wood
Contractors:
- EV Infrastructure LLC dba brytemove energy
- PEARSON ELECTRICAL OF ARIZONA LLC
Permit Reviews
Permit Number - T21CM05063
Permit Status: Final
Permit Description: · INSTALL ONE (1) CHARGEPOINT EXPRESS 250 FAST CHARGER AT THE GUEST PARKING.
· INSTALL ONE (1) DUAL PORT L2 CHARGER AT THE GUEST PARKING.
· INSTALL ONE (1) SINGLE PORT L2 CHARGER AT THE NEW VEHICLE DELIVERY AREA.
· INSTALL TWO (2) ENEL X JUICEBOX 32A W/ NEMA PLUGS FOR THE SERVICE DEPARTMENT.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/17/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 07/16/2021 | COMPLETED |
| 07/21/2021 | RESUBMITTAL | 07/29/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM05063
Permit Description: · INSTALL ONE (1) CHARGEPOINT EXPRESS 250 FAST CHARGER AT THE GUEST PARKING.
· INSTALL ONE (1) DUAL PORT L2 CHARGER AT THE GUEST PARKING.
· INSTALL ONE (1) SINGLE PORT L2 CHARGER AT THE NEW VEHICLE DELIVERY AREA.
· INSTALL TWO (2) ENEL X JUICEBOX 32A W/ NEMA PLUGS FOR THE SERVICE DEPARTMENT.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2021 | ELECTRIC - FINAL | ESTEVENS | Approved | Approved. Close case. |
| 10/01/2021 | BUILDING - FINAL | ESTEVENS | Approved | Approved. Close case. |
| 10/01/2021 | ELECTRIC - INTERMEDIATE | ESTEVENS | Approved | Approved. Close case. |
| 10/01/2021 | ELECTRIC - UNDERGROUND | ESTEVENS | Approved | Approved. Close case. |