Permit: T21CM05007
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
29 W LALO WY
Address NEW:
29 W LALO WY
Apply Date:
06/15/2021
Applicant:
Dan Kishinami
Description:
New Townhome
Permit Reviews
Permit Number - T21CM05007
Permit Status: Inspections
Permit Description: New Townhome
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2021 | 3RD PARTY REVIEW - RESIDENTIAL | 08/04/2021 | COMPLETED |
| 08/19/2021 | RESUBMITTAL | 10/04/2021 | COMPLETED |
| 06/24/2026 | SPECIAL INSPECTION REVIEW v.1 | 06/25/2026 | APPROVED |
| 01/29/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/04/2026 | REQUIRES RESUBMIT |
| 04/19/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2023 | APPROVED |
| 07/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/17/2025 | APPROVED |
| 02/11/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 02/12/2026 | APPROVED |
| 12/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/02/2026 | REQUIRES RESUBMIT |
| 05/20/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/20/2026 | APPROVED |
Conditions
Permit Number - T21CM05007
Permit Status: Inspections
Permit Description: New Townhome
| Date | Description | Comments |
|---|---|---|
| 08/04/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 07/17/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 07/17/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 12/31/2025 | SPECIAL INSPECTION IS REQUIRED FOR MORTAR AND GROUT | |
| 12/31/2025 | SPECIAL INSPECTION IS REQUIRED FOR RE-BAR | |
| 12/31/2025 | SPECIAL INSPECTION IS REQUIRED FOR SOILS EXCAVATION | |
| 01/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/17/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T21CM05007
Permite Description: New Townhome
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/22/2023 | COT - RSEL - Electrical Underground | N/A | Partial Pass | |
| 05/14/2024 | COT - LCPL - Plumbing Intermediate | N/A | Re-inspection required | 8/7/23: YWL inspections need tracer wire 5/14/24: penetrations throughout need to be fire caulked. |
| 09/20/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 9/20/24: grounds and neutrals must be separated at sub-panels. NFPA 70 . NEC 250.142. |
| 12/02/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 12-2-25: firefoam penetrations around flex at furnace, add plastic bushings at furnace for low voltage wires, missing vacuum breaker at hose bib, paint all exterior plastics |
| 01/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | Building progress only. |
| 03/25/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | 3/25/24: first floor firewall between units per plan ok to proceed. |
| 08/07/2026 | COT - RSEL - Construction Power | N/A | Not Applicable | |
| 08/07/2026 | RSBU - Building Final | N/A | Not Ready | Unit 29 threshold not meeting ada requirements. bad dimmer switch. Studor vent shall be above flood rim level. Provide shackle lock for water heater. Ensure dryer vents do not have screens. Still need to verify rooftops. |
Completed Inspections
Permit Status: Inspections
Permit Number: T21CM05007
Permit Description: New Townhome
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} | |
| 08/03/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to place concrete in progress areas.} | |
| 09/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to shade and proceed } |
|
| 11/18/2022 | COT - RSBU - Preslab | Passed | This inspection should read plumbing pre-slab | |
| 02/15/2023 | COT - RSPL - Sewer | Passed | ||
| 08/11/2023 | COT - RSPL - Yard Water Line | Passed | 8/11/2023 Approved. Okay to backfill shading required. | |
| 04/12/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/15/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 06/28/2024 | RSEL - Electrical Progress | Passed | Ok to insulate and cover walls. | |
| 09/26/2024 | BULD - Electrical Clearance | Passed | Ok to set meter for new service. | |
| 07/16/2025 | COT - RSEL - Electrical Final | Passed | ||
| 07/16/2025 | COT - RSME - Mechanical Final | Passed | ||
| 02/24/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 08/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/07/2026 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 08/07/2026 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 08/07/2026 | COT - LCBU - Sustainability | Passed | ||
| 08/07/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/07/2026 | COT - LCBU - Framing | Passed | ||
| 08/07/2026 | RSME - Mechanical Progress | Passed |