Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
29 W LALO WY
Address NEW:
29 W LALO WY
Apply Date:
06/15/2021
Applicant:
Dan Kishinami
Description:
New Townhome

Permit Reviews

Permit Number - T21CM05007
Permit Status: Inspections
Permit Description: New Townhome
Start Date Submittal Complete Date Status  
07/14/2021 3RD PARTY REVIEW - RESIDENTIAL 08/04/2021 COMPLETED Review Details
08/19/2021 RESUBMITTAL 10/04/2021 COMPLETED Review Details
06/24/2026 SPECIAL INSPECTION REVIEW v.1 06/25/2026 APPROVED Review Details
01/29/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/04/2026 REQUIRES RESUBMIT Review Details
04/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2023 APPROVED Review Details
07/14/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/17/2025 APPROVED Review Details
02/11/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.3 02/12/2026 APPROVED Review Details
12/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/02/2026 REQUIRES RESUBMIT Review Details
05/20/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/20/2026 APPROVED Review Details

Conditions

Permit Number - T21CM05007
Permit Status: Inspections
Permit Description: New Townhome
Date Description Comments
08/04/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/17/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/17/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/31/2025 SPECIAL INSPECTION IS REQUIRED FOR MORTAR AND GROUT
12/31/2025 SPECIAL INSPECTION IS REQUIRED FOR RE-BAR
12/31/2025 SPECIAL INSPECTION IS REQUIRED FOR SOILS EXCAVATION
01/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/17/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Inspections
Permit Number: T21CM05007
Permite Description: New Townhome
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
03/22/2023 COT - RSEL - Electrical Underground N/A Partial Pass
05/14/2024 COT - LCPL - Plumbing Intermediate N/A Re-inspection required 8/7/23: YWL inspections need tracer wire
5/14/24: penetrations throughout need to be fire caulked.
09/20/2024 BULD - Electrical Clearance N/A Re-inspection required 9/20/24: grounds and neutrals must be separated at sub-panels. NFPA 70 . NEC 250.142.
12/02/2025 COT - RSPL - Plumbing Final N/A Re-inspection required 12-2-25: firefoam penetrations around flex at furnace, add plastic bushings at furnace for low voltage wires, missing vacuum breaker at hose bib, paint all exterior plastics
01/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass Building progress only.
03/25/2024 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Partial Pass 3/25/24: first floor firewall between units per plan ok to proceed.
08/07/2026 COT - RSEL - Construction Power N/A Not Applicable
08/07/2026 RSBU - Building Final N/A Not Ready Unit 29 threshold not meeting ada requirements. bad dimmer switch. Studor vent shall be above flood rim level. Provide shackle lock for water heater. Ensure dryer vents do not have screens. Still need to verify rooftops.

Completed Inspections

Permit Status: Inspections
Permit Number: T21CM05007
Permit Description: New Townhome
Total Completed Inspections - 20
Date Description Inspector Results Comments
08/03/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
08/03/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to place concrete in progress areas.}
09/07/2022 COT - RSPL - Rough Soil Passed {Activity date: 09/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to shade and proceed

}
11/18/2022 COT - RSBU - Preslab Passed This inspection should read plumbing pre-slab
02/15/2023 COT - RSPL - Sewer Passed
08/11/2023 COT - RSPL - Yard Water Line Passed 8/11/2023 Approved. Okay to backfill shading required.
04/12/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/15/2024 COT - LCPL - Plumbing Intermediate Passed
06/28/2024 RSEL - Electrical Progress Passed Ok to insulate and cover walls.
09/26/2024 BULD - Electrical Clearance Passed Ok to set meter for new service.
07/16/2025 COT - RSEL - Electrical Final Passed
07/16/2025 COT - RSME - Mechanical Final Passed
02/24/2026 COT - RSPL - Plumbing Final Passed
08/07/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/07/2026 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
08/07/2026 COT - LCPL - Plumbing Above Ceiling Passed
08/07/2026 COT - LCBU - Sustainability Passed
08/07/2026 COT - RSEL - Outdoor Lighting Passed
08/07/2026 COT - LCBU - Framing Passed
08/07/2026 RSME - Mechanical Progress Passed

Documents

File Name Document Type  
29 W LALO WAY, MORTAR AND GROUT LETTER-2026-06-18_V1.PDF DOCUMENTS VIEW
29 W LALO WAY, POST-INSTALLED ANCHOR LETTER-2026-05-18_V1.PDF DOCUMENTS VIEW
T21CM05007 SI REPORT, REV 2-2026-02-04_V3.PDF DOCUMENTS VIEW
R75714385.BLDG_3_-_5-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
LAYOUT BLDG 3-5 - 1F.MMDL-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
LAYOUT BLDG 3-5 - ROOF.MMDL-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
LAYOUT BLDG 3-5 - 2F.MMDL-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
CALC PACKAGE.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
INSPECTION CARD.PDF DOCUMENTS VIEW
COMPLIANCE CERT.PDF DOCUMENTS VIEW
PSA.PDF DOCUMENTS VIEW
SYSTEMS DESIGN REPORT.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW