Permit Details

Status:
Stop Work Order
Type:
Residential Building - One or Two Family
Address:
33 W LALO WY
Apply Date:
06/15/2021
Applicant:
JR Durazo
Description:
New Townhome

Permit Reviews

Permit Number - T21CM05006
Permit Status: Stop work order
Permit Description: New Townhome
Start Date Submittal Complete Date Status  
07/14/2021 3RD PARTY REVIEW - RESIDENTIAL 08/04/2021 COMPLETED Review Details
08/19/2021 RESUBMITTAL 10/04/2021 COMPLETED Review Details
04/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T21CM05006
Permit Status: Stop work order
Permit Description: New Townhome
Total Outstanding Activity Conditions - 5
Date Name
08/04/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
08/04/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/04/2021 SPECIAL INSPECTION IS REQUIRED FOR RE-BAR
08/04/2021 SPECIAL INSPECTION IS REQUIRED FOR SOILS EXCAVATION
08/04/2021 SPECIAL INSPECTION IS REQUIRED FOR MORTAR AND GROUT

Conditions

Permit Number - T21CM05006
Permit Status: Stop work order
Permit Description: New Townhome
Date Description Comments
08/04/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)

Outstanding Inspections

Permit Status: Stop Work Order
Permit Number: T21CM05006
Permite Description: New Townhome
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/27/2022 RSBU - Building Final N/A Not Ready
10/27/2022 COT - RSEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Above Ceiling N/A Not Ready
10/26/2022 COT - LCBU - Sustainability N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready
04/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready 4/12/24: not ready
05/14/2024 COT - LCPL - Plumbing Intermediate N/A Re-inspection required 8/7/23: YWL inspections need tracer wire
5/14/24: penetrations throughout need to be fire caulked.
03/25/2024 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Partial Pass 3/25/24: first floor firewall between units per plan ok to proceed.
09/20/2024 BULD - Electrical Clearance N/A Re-inspection required 9/20/24: grounds and neutrals must be separated at sub-panels. NFPA 70 . NEC 250.142.

Completed Inspections

Permit Status: Stop Work Order
Permit Number: T21CM05006
Permit Description: New Townhome
Total Completed Inspections - 13
Date Description Inspector Results Comments
08/03/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
08/03/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to place concrete in progress areas.}
09/07/2022 COT - RSPL - Rough Soil Passed {Activity date: 09/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to shade and proceed

}
11/18/2022 COT - RSBU - Preslab Passed This inspection should read plumbing pre-slab
02/15/2023 COT - RSPL - Sewer Passed
08/11/2023 COT - RSPL - Yard Water Line Passed 8/11/2023 Approved. Okay to backfill shading required.
04/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/15/2024 COT - LCPL - Plumbing Intermediate Passed
06/26/2024 RSME - Mechanical Progress Passed
06/28/2024 RSEL - Electrical Progress Passed Ok to insulate and cover walls.
07/24/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
08/16/2024 COT - RSEL - Electrical Underground Passed
09/26/2024 BULD - Electrical Clearance Passed Ok to set meter for new service.

Documents

File Name Document Type  
LAYOUT BLDG 3-5 - ROOF.MMDL-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
R75714385.BLDG_3_-_5-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
LAYOUT BLDG 3-5 - 1F.MMDL-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
LAYOUT BLDG 3-5 - 2F.MMDL-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
CALC PACKAGE.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
INSPECTION CARD.PDF DOCUMENTS VIEW
COMPLIANCE CERT.PDF DOCUMENTS VIEW
PSA.PDF DOCUMENTS VIEW
SYSTEMS DESIGN REPORT.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW