Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
32 W 18TH ST
Address NEW:
32 W 18TH ST
Apply Date:
06/15/2021
Applicant:
Dan Kishinami
Description:
New Townhome

Permit Reviews

Permit Number - T21CM04996
Permit Status: Complete
Permit Description: New Townhome
Start Date Submittal Complete Date Status  
07/14/2021 3RD PARTY REVIEW - RESIDENTIAL 08/04/2021 COMPLETED Review Details
08/19/2021 RESUBMITTAL 10/04/2021 COMPLETED Review Details
04/02/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/06/2026 APPROVED Review Details
01/29/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/03/2026 REQUIRES RESUBMIT Review Details
02/11/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.3 02/12/2026 APPROVED Review Details
04/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2023 APPROVED Review Details
12/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/31/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T21CM04996
Permit Status: Complete
Permit Description: New Townhome
Date Description Comments
08/04/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
08/04/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
08/04/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/04/2021 SPECIAL INSPECTION IS REQUIRED FOR RE-BAR
08/04/2021 SPECIAL INSPECTION IS REQUIRED FOR SOILS EXCAVATION
08/04/2021 SPECIAL INSPECTION IS REQUIRED FOR MORTAR AND GROUT
01/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/17/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM04996
Permite Description: New Townhome
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
08/22/2023 COT - LCPL - Plumbing Intermediate N/A Re-inspection required Not ready. Leak above the ceiling third floor. Roof drain. 8/22/2023
07/01/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass This inspection is for masonry pre-grout of patio walls at 0” - 48”. Ok to place grout in progress areas.
02/15/2023 COT - RSEL - Grounding/Bonding N/A Partial Pass partial approval for UFER
10/27/2022 COT - RSEL - Outdoor Lighting N/A Not Ready
04/06/2023 COT - RSEL - Electrical Underground N/A Partial Pass UG conduit from house panel to meter pack area ok to cover
08/15/2023 COT - LCPL - Plumbing Above Ceiling N/A Not Ready Contractor cancelled.
10/26/2022 COT - LCBU - Sustainability N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM04996
Permit Description: New Townhome
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/22/2022 COT - RSPL - Rough Soil Passed {Activity date: 07/22/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
08/10/2022 COT - RSBU - Preslab Passed {Activity date: 08/10/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
02/15/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
02/15/2023 COT - RSPL - Sewer Passed
05/04/2023 COT - RSPL - Yard Water Line Passed
06/07/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed East side of demising wall connected to fire wall of 28 w 18th stree.
06/26/2023 COT - LCBU - Framing Passed Framing to include interior framing and exterior sheathing; roof nailing to be included on this inspection.
08/24/2023 COT - LCPL - Plumbing Intermediate Passed
09/05/2023 RSEL - Electrical Progress Passed
07/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed OK to insulate and sheet rock.
09/26/2024 BULD - Electrical Clearance Passed Ok to set meter for new service.
03/04/2025 COT - RSPL - Plumbing Final Passed
03/04/2025 COT - RSEL - Electrical Final Passed
03/04/2025 COT - RSME - Mechanical Final Passed
03/12/2025 COT - RSEL - Construction Power Passed This inspection is for patio deck framing; Ok to place flooring on deck surface. Construction power is complete.
08/26/2025 RSBU - Building Final Passed
10/27/2025 COT - RSEL - Grounding/Bonding Passed
10/27/2025 COT - RSEL - Outdoor Lighting Passed
10/27/2025 COT - RSEL - Electrical Underground Passed
10/27/2025 COT - LCPL - Plumbing Above Ceiling Passed
10/27/2025 COT - LCBU - Sustainability Passed
10/27/2025 RSME - Mechanical Progress Passed