Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
53 W LALO WY
Address NEW:
53 W LALO WY
Apply Date:
06/15/2021
Applicant:
Dan Kishinami
Description:
New Townhome

Permit Reviews

Permit Number - T21CM04994
Permit Status: Complete
Permit Description: New Townhome
Start Date Submittal Complete Date Status  
07/14/2021 3RD PARTY REVIEW - RESIDENTIAL 08/04/2021 COMPLETED Review Details
08/19/2021 RESUBMITTAL 10/04/2021 COMPLETED Review Details
04/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2023 APPROVED Review Details
03/19/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/20/2026 APPROVED Review Details
12/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/31/2025 REQUIRES RESUBMIT Review Details
02/11/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.3 02/12/2026 APPROVED Review Details
01/29/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/02/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T21CM04994
Permit Status: Complete
Permit Description: New Townhome
Date Description Comments
08/04/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
08/04/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/04/2021 SPECIAL INSPECTION IS REQUIRED FOR CONCRETE COMPRESSIVE STRENGTH
08/04/2021 SPECIAL INSPECTION IS REQUIRED FOR REBAR
08/04/2021 SPECIAL INSPECTION IS REQUIRED FOR SOILS EXCAVATION
08/04/2021 SPECIAL INSPECTION IS REQUIRED FOR MORTAR AND GROUT
01/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/17/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM04994
Permite Description: New Townhome
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - LCBU - Framing N/A Canceled Inspection Canceled
11/04/2022 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Plumbing Intermediate N/A Canceled Inspection Canceled
11/04/2022 COT - RSEL - Outdoor Lighting N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Plumbing Above Ceiling N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Sustainability N/A Canceled Inspection Canceled
11/04/2022 COT - RSPL - Sewer N/A Canceled Inspection Canceled
11/04/2022 COT - RSEL - Construction Power N/A Canceled Inspection Canceled
11/04/2022 RSEL - Electrical Progress N/A Canceled Inspection Canceled
11/04/2022 RSME - Mechanical Progress N/A Canceled Inspection Canceled
11/04/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Canceled Inspection Canceled
10/05/2023 RSBU - Building Progress N/A Partial Pass 10/5/23: framing passed
03/29/2023 COT - RSEL - Electrical Underground N/A Partial Pass Two inch conduit from transformer to meter pack.
09/10/2024 COT - BULD - SWG Clearance N/A Not Applicable No gas service at this site

Completed Inspections

Permit Status: Complete
Permit Number: T21CM04994
Permit Description: New Townhome
Total Completed Inspections - 12
Date Description Inspector Results Comments
01/05/2023 COT - RSBU - Stem Wall/Retaining Wall Passed
02/15/2023 COT - RSPL - Rough Soil Passed
05/14/2024 COT - RSEL - Electrical Underground Passed 5/14/24: electrical underground to riser passed. Ok to backfill
09/10/2024 COT - RSEL - Grounding/Bonding Passed
09/10/2024 COT - RSBU - Roof Nailing Passed
09/10/2024 COT - RSBU - Preslab Passed
09/26/2024 BULD - Electrical Clearance Passed New meter set is for House Meter.
02/12/2025 RSBU - Building Final Passed
02/12/2025 COT - RSEL - Electrical Final Passed
02/12/2025 COT - RSME - Mechanical Final Passed
02/12/2025 COT - RSPL - Plumbing Final Passed
04/01/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/1/26: Duplicate inspection

Documents

File Name Document Type  
53 W LALO WAY, POST-INSTALLED ANCHOR LETTER-2026-03-18_V1.PDF DOCUMENTS VIEW
T21CM04994 SI REPORT, REV 1-2026-02-04_V3.PDF DOCUMENTS VIEW
LAYOUT BLDG 9 - ROOF.MMDL-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
LAYOUT BLDG 9 - 1F.MMDL-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
R75010867.BLDG_9-SSE REVIEW 230414_V1.PDF DOCUMENTS VIEW
CALC PACKAGE.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
COMPLIANCE CERT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PSA.PDF DOCUMENTS VIEW
SYSTEMS DESIGN REPORT.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW