Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Address NEW:
2914 N CAMPBELL AV
Apply Date:
06/11/2021
Applicant:
Onyx Creative
Description:
SALON
Architects:
  • Architrilogy PC / Jerry Burns
Contractors:
  • MW MORRISSEY CONSTRUCTION LLC

Permit Reviews

Permit Number - T21CM04907
Permit Status: C of o
Permit Description: SALON
Start Date Submittal Complete Date Status  
06/11/2021 3RD PARTY REVIEW - COMMERCIAL TI 08/03/2021 COMPLETED Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T21CM04907
Permit Description: SALON
Total Completed Inspections - 27
Date Description Inspector Results Comments
08/31/2021 PLUMBING - ROUGH, SOIL DQUINN Approved Ap
Rough ok all the way to ext. connection.
Ok to backfill and patch.
08/31/2021 PLUMBING - ROUGH, SOIL DQUINN Approved Ap
Rough ok all the way to ext. connection.
Ok to backfill and patch.
10/06/2021 ELECTRIC - UNDERGROUND DQUINN Approved Ap
Conduit to water feature ok
10/06/2021 PLUMBING - YARD WTR LINE/TEST DQUINN Approved Ap
10/06/2021 PLUMBING - PRE SLAB DQUINN Approved Ap
Plumbing to lobby water feature ok to backfill
10/29/2021 MECHANICAL - INTERMEDIATE JBURGE Approved Approved
10/29/2021 ELECTRIC - INTERMEDIATE JBURGE Approved Approved. In wall electric.
10/29/2021 ELECTRIC - UFER JBURGE Approved Approved
10/29/2021 FRAMING JBURGE Approved Approved. Ok to insulate and cover walls.
11/03/2021 PLUMBING - INTERMEDIATE DQUINN Approved Ap
Last 10 Salon room’s potable and dwv ok
11/05/2021 SHEET ROCK NAILING DQUINN Approved Ap
Ok to tape and paint all rock.
11/05/2021 BUILDING ABOVE CEILING DQUINN Approved Ap
11/05/2021 ELECTRIC - ABOVE CEILING DQUINN Approved Ap
11/05/2021 PLUMBING - ABOVE CEILING DQUINN Approved Ap
11/05/2021 MECHANICAL - ABOVE CEILING DQUINN Approved Ap

Ok to drop all lids, once the mechanical engineer signs off on two trunk changes.
11/16/2021 PLUMBING - GAS PRESSURE TEST DQUINN Approved Ap
Main line and all laterals ok

No gas clearance now. Contractor will recall for clearance in Dec./January.
12/21/2021 TEP CLEARANCE - PM DQUINN Approved CODE INCR/PNLH1
12/21/2021 ELECTRIC - SERVICE UPGRADE DQUINN Approved Ap

Clear incr for T I at 2914 n. Campbell Ave. - PNL H 1
12/21/2021 ELECTRIC - FINAL DQUINN Approved pa
New panels installed for T I.
01/21/2022 GAS CLEARANCE DQUINN Approved CODE GAS
01/21/2022 PLUMBING - GAS PRESS TEST FNL DQUINN Approved Ap

Clear gas
03/24/2022 FIRE SPKLR - FINAL CGates Approved T21FC00576 was approved on 3/10/22 by CBasaldua
03/30/2022 MECHANICAL - FINAL DQUINN Approved Ap
03/30/2022 PLUMBING - FINAL DQUINN Approved Ap
03/31/2022 BUILDING - FINAL DQUINN Approved Ap

Close permit

Ok for C of O
03/31/2022 FIRE - FINAL CGates Approved
03/31/2022 FIRE - ALARM FINAL CGates Approved

Documents

File Name Document Type  
T21CM04907 AIR BALANCE1.PDF DOCUMENTS VIEW
T21CM04907 WATER REPORT1.PDF DOCUMENTS VIEW
C OF O 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
C OF O.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW