Permit Details

Status:
Complete
Type:
Commercial Building
Address:
1222 S FREEWAY
Address NEW:
1222 S FREEWAY
Apply Date:
06/10/2021
Applicant:
Description:
TI:HOTEL

Permit Reviews

Permit Number - T21CM04867
Permit Status: Complete
Permit Description: TI:HOTEL
Start Date Submittal Complete Date Status  
06/14/2021 3RD PARTY REVIEW - COMMERCIAL TI 07/21/2022 COMPLETED Review Details
01/11/2024 COMMERCIAL REVIEW - FULL v.1 02/28/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T21CM04867
Permit Status: Complete
Permit Description: TI:HOTEL
Date Description Comments
07/21/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/21/2022 SHOP DRAWINGS REQUIRED FOR AUTOMATIC FIRE SPRINKLERS.
07/21/2022 SHOP DRAWINGS REQUIRED FOR FIRE ALARM.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM04867
Permite Description: TI:HOTEL
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
08/31/2023 COT - HCBU - Interior Shear Bracing N/A Not Applicable
10/26/2022 COT - FCON - Underground Pressure N/A Not Ready
12/13/2023 COT - LCBU - Preslab N/A Partial Pass 12/13/2023. Okay to grout trash enclosure at 6'. Pad at trash enclosure okay for concrete placement.
08/18/2023 COT - LCPL - Plumbing Intermediate N/A Partial Pass 8/18/23: 115 stack vent, 110 stack vent, 107 stack vent, in house laundry room stack vent, 102 stack vent
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
10/26/2022 COT - FCON - Underground Flush N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM04867
Permit Description: TI:HOTEL
Total Completed Inspections - 24
Date Description Inspector Results Comments
02/14/2023 COT - HCBU - Excavation/Rebar/Zoning Passed Footing for 6’ screen wall has been poured.
02/27/2023 COT - LCBU - Building Progress Passed Block fence has been laid, 5/8" rebar is 48" on center. Okay to grout wall.
07/26/2023 COT - LCEL - Electrical Intermediate Passed 7/26/23: Electrical rough-in for Building #1 is complete. Okay to cover walls with drywall,tape, and texture.
08/31/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
08/31/2023 COT - LCPL - Rough Soil Passed Waste and vent lines are under hydro test.
08/31/2023 COT - LCBU - Building Above Ceiling Passed
08/31/2023 COT - LCEL - Electrical Above Ceiling Passed
08/31/2023 COT - LCBU - Framing Passed
01/09/2024 BULD - Electrical Clearance Passed Approved 400A distribution panel, RECN Clearance was called into TEP at 2:40pm
11/19/2024 COT - LCME - Mechanical Final Passed
11/19/2024 COT - LCPL - Plumbing Final Passed
11/19/2024 COT - LCEL - Electrical Final Passed
11/21/2024 COT - LCEL - Electrical Underground Passed
11/21/2024 COT - FCON - Underground Pressure Passed
11/21/2024 COT - LCBU - Preslab Passed
11/21/2024 COT - LCPL - Plumbing Intermediate Passed
03/06/2025 FCON – OH Piping & Hydro Passed Building permit in complete status
12/16/2024 COT - FCON - Alarm - Final Passed
12/27/2024 COT - FCON - Underground Flush Passed passed via TF-FCP-0224-00137
01/07/2025 COT - FCON - Sprinkler - Final Passed
01/07/2025 COT - FCON - Fire - Final Passed
12/16/2024 COT - LCEL - Outdoor Lighting Passed
12/16/2024 COT - LCME - Mechanical Intermediate Passed
12/24/2024 COT - LCBU - Building Final Passed