Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
8140 E 22ND ST
Apply Date:
06/03/2021
Applicant:
Brent Miller Stand8
Description:
TOWER WORK: REMOVE (2) ANTENNAS; REMOVE (4) RRHs; REMOVE (4) DIPLEXERS; REMOVE (2) HYBRID CABLE (1-1/2"); INSTALL (18) COAX CABLES (7/8"); INSTALL (3) ANTENNAS; INSTALL (4) RRHs; INSTALL (3) BREAKOUT PENDANTS; INSTALL (3) HYBRID CABLES (1-1/2") GROUND WORK: REMOVE (2) SSC CABINET; REMOVE (2) ULTRASITE CABINET; REMOVE SAS-Mxp; REMOVE 200A DC PLANT; REMOVE (1) FSMF; RELOCATE (1) FXFB; RELOCATE (1) ASIA; RELOCATE (2) AMIAs; RELOCATE (1) ESMB; RELOCATE (1) FSMF; INSTALL (1) HPL3 SSC CABINET; INSTALL (1) HPL3 BATTERY CABINET; INSTALL (3) JUNCTION BOXES; INSTALL (3) ABICs; INSTALL (1) ASIB; INSTALL (1) ASIK; INSTALL (5) ABILs; INSTALL (2) CSR-IXRe V2 (GEN2)
Architects:
  • NB+C Engineering Services
Contractors:
  • TBD

Permit Reviews

Permit Number - T21CM04620
Permit Status: Final
Permit Description: TOWER WORK: REMOVE (2) ANTENNAS; REMOVE (4) RRHs; REMOVE (4) DIPLEXERS; REMOVE (2) HYBRID CABLE (1-1/2"); INSTALL (18) COAX CABLES (7/8"); INSTALL (3) ANTENNAS; INSTALL (4) RRHs; INSTALL (3) BREAKOUT PENDANTS; INSTALL (3) HYBRID CABLES (1-1/2") GROUND WORK: REMOVE (2) SSC CABINET; REMOVE (2) ULTRASITE CABINET; REMOVE SAS-Mxp; REMOVE 200A DC PLANT; REMOVE (1) FSMF; RELOCATE (1) FXFB; RELOCATE (1) ASIA; RELOCATE (2) AMIAs; RELOCATE (1) ESMB; RELOCATE (1) FSMF; INSTALL (1) HPL3 SSC CABINET; INSTALL (1) HPL3 BATTERY CABINET; INSTALL (3) JUNCTION BOXES; INSTALL (3) ABICs; INSTALL (1) ASIB; INSTALL (1) ASIK; INSTALL (5) ABILs; INSTALL (2) CSR-IXRe V2 (GEN2)
Start Date Submittal Complete Date Status  
06/03/2021 CELL TOWER/ANTENNAS 07/08/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T21CM04620
Permit Description: TOWER WORK: REMOVE (2) ANTENNAS; REMOVE (4) RRHs; REMOVE (4) DIPLEXERS; REMOVE (2) HYBRID CABLE (1-1/2"); INSTALL (18) COAX CABLES (7/8"); INSTALL (3) ANTENNAS; INSTALL (4) RRHs; INSTALL (3) BREAKOUT PENDANTS; INSTALL (3) HYBRID CABLES (1-1/2") GROUND WORK: REMOVE (2) SSC CABINET; REMOVE (2) ULTRASITE CABINET; REMOVE SAS-Mxp; REMOVE 200A DC PLANT; REMOVE (1) FSMF; RELOCATE (1) FXFB; RELOCATE (1) ASIA; RELOCATE (2) AMIAs; RELOCATE (1) ESMB; RELOCATE (1) FSMF; INSTALL (1) HPL3 SSC CABINET; INSTALL (1) HPL3 BATTERY CABINET; INSTALL (3) JUNCTION BOXES; INSTALL (3) ABICs; INSTALL (1) ASIB; INSTALL (1) ASIK; INSTALL (5) ABILs; INSTALL (2) CSR-IXRe V2 (GEN2)
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/26/2022 FRAMING RCHANDLER Approved AP 1090
04/26/2022 ELECTRIC - FINAL RCHANDLER Approved AP
04/26/2022 BUILDING - FINAL RCHANDLER Approved AP

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
IT.PDF DOCUMENTS VIEW
NOTICE OF ELIGIBLE FACILITIES REQUEST.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
STRUCTURAL ANALYSIS REPORT.PDF DOCUMENTS VIEW
PLAN.PDF DOCUMENTS VIEW