Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
05/19/2021
Applicant:
Brent Miller Stand8
Description:
TOWER WORK: REMOVE (3) ANTENNAS; REMOVE (6) RRHS ; REMOVE(l)COVP; REMOVE (3) TMAS ; RELOCATE (6) ANTENNAS; RELOCATE (3) RRHS; INSTALL (3) ANTENNAS ; INSTALL (3) RRHS ; INSTALL (2) BREAKOUT PENDANTS; INSTALL (Z) HYBRID (1-1/2") INSTALL (3) TMAS GROUND WORK: REMOVE (2) GENERIC CABINET; RELOCATE {1) ESMB; RELOCATE (1) FSMF; RELOCATE (I) ASIA; RELOCATE (1) ASIK; RELOCATE {3) ABIAS ; RELOCATE {1) ABlL; RELOCATE {Z) AMI.AS; RELOCATE (1) FXFB
Architects:
  • NB+C Engineering Services
Contractors:
  • TBD

Permit Reviews

Permit Number - T21CM04307
Permit Status: Final
Permit Description: TOWER WORK: REMOVE (3) ANTENNAS; REMOVE (6) RRHS ; REMOVE(l)COVP; REMOVE (3) TMAS ; RELOCATE (6) ANTENNAS; RELOCATE (3) RRHS; INSTALL (3) ANTENNAS ; INSTALL (3) RRHS ; INSTALL (2) BREAKOUT PENDANTS; INSTALL (Z) HYBRID (1-1/2") INSTALL (3) TMAS GROUND WORK: REMOVE (2) GENERIC CABINET; RELOCATE {1) ESMB; RELOCATE (1) FSMF; RELOCATE (I) ASIA; RELOCATE (1) ASIK; RELOCATE {3) ABIAS ; RELOCATE {1) ABlL; RELOCATE {Z) AMI.AS; RELOCATE (1) FXFB
Start Date Submittal Complete Date Status  
05/19/2021 CELL TOWER/ANTENNAS 06/17/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T21CM04307
Permit Description: TOWER WORK: REMOVE (3) ANTENNAS; REMOVE (6) RRHS ; REMOVE(l)COVP; REMOVE (3) TMAS ; RELOCATE (6) ANTENNAS; RELOCATE (3) RRHS; INSTALL (3) ANTENNAS ; INSTALL (3) RRHS ; INSTALL (2) BREAKOUT PENDANTS; INSTALL (Z) HYBRID (1-1/2") INSTALL (3) TMAS GROUND WORK: REMOVE (2) GENERIC CABINET; RELOCATE {1) ESMB; RELOCATE (1) FSMF; RELOCATE (I) ASIA; RELOCATE (1) ASIK; RELOCATE {3) ABIAS ; RELOCATE {1) ABlL; RELOCATE {Z) AMI.AS; RELOCATE (1) FXFB
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/08/2021 FRAMING TGAUSP Approved 1090 (BUILDING - FINAL) - Approved and complete
10/08/2021 ELECTRIC - FINAL TGAUSP Approved Approved
10/08/2021 BUILDING - FINAL TGAUSP Approved Approved and complete

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ENG APPROVAL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUC REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
ENG APPROVAL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
STRUC REPORT.PDF DOCUMENTS VIEW