Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM04292
Permit Details
Apply Date:
05/19/2021
Applicant:
Brent Miller Stand8
Description:
TOWER WORK: REMOVE (3) ANTENNAS; REMOVE (6) RRHs; REMOVE (1) JUNCTION BOX; REMOVE (1) HYBRID CABLES (5/8"); INSTALL (3) ANTENNAS; INSTALL (3) RRHs; INSTALL (2) BREAKOUT PENDANTS;INSTALL (2) HYBRID CABLES (1-1/2") GROUND WORK: REMOVE ALL EXISTING EQUIPMENT CABINETS; REMOVE (1) JUNCTION BOX; RELOCATE (1) FXFB; RELOCATE (1) ESMB; RELOCATE (1) FSMF; RELOCATE (1) ASIA; RELOCATE (1) ASIK;· RELOCATE (2) ABIAs; RELOCATE (1) ABIL; RELOCATE (2) AMIAs;· INSTALL (1) HPL3 600A DC CABINET; INSTALL (1) 600A BATTERY CABINET; INSTALL (2) JUNCTION BOXES; INSTALL (1) ASIK; INSTALL (1) ASIB; INSTALL (5) ABILs; INSTALL (3) ABICs
Contractors:
- TBD
Permit Reviews
Permit Number - T21CM04292
Permit Status: Final
Permit Description: TOWER WORK: REMOVE (3) ANTENNAS; REMOVE (6) RRHs; REMOVE (1) JUNCTION BOX; REMOVE (1) HYBRID CABLES (5/8"); INSTALL (3) ANTENNAS; INSTALL (3) RRHs; INSTALL (2) BREAKOUT PENDANTS;INSTALL (2) HYBRID CABLES (1-1/2")
GROUND WORK: REMOVE ALL EXISTING EQUIPMENT CABINETS; REMOVE (1) JUNCTION BOX; RELOCATE (1) FXFB; RELOCATE (1) ESMB; RELOCATE (1) FSMF; RELOCATE (1) ASIA; RELOCATE (1) ASIK;· RELOCATE (2) ABIAs; RELOCATE (1) ABIL; RELOCATE (2) AMIAs;· INSTALL (1) HPL3 600A DC CABINET; INSTALL (1) 600A BATTERY CABINET; INSTALL (2) JUNCTION BOXES; INSTALL (1) ASIK; INSTALL (1) ASIB; INSTALL (5) ABILs; INSTALL (3) ABICs
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/19/2021 | CELL TOWER/ANTENNAS | 06/17/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM04292
Permit Description: TOWER WORK: REMOVE (3) ANTENNAS; REMOVE (6) RRHs; REMOVE (1) JUNCTION BOX; REMOVE (1) HYBRID CABLES (5/8"); INSTALL (3) ANTENNAS; INSTALL (3) RRHs; INSTALL (2) BREAKOUT PENDANTS;INSTALL (2) HYBRID CABLES (1-1/2")
GROUND WORK: REMOVE ALL EXISTING EQUIPMENT CABINETS; REMOVE (1) JUNCTION BOX; RELOCATE (1) FXFB; RELOCATE (1) ESMB; RELOCATE (1) FSMF; RELOCATE (1) ASIA; RELOCATE (1) ASIK;· RELOCATE (2) ABIAs; RELOCATE (1) ABIL; RELOCATE (2) AMIAs;· INSTALL (1) HPL3 600A DC CABINET; INSTALL (1) 600A BATTERY CABINET; INSTALL (2) JUNCTION BOXES; INSTALL (1) ASIK; INSTALL (1) ASIB; INSTALL (5) ABILs; INSTALL (3) ABICs
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/18/2022 | FRAMING | TLUNDBERG | Approved | AP |
04/18/2022 | ELECTRIC - FINAL | TLUNDBERG | Approved | AP |
04/18/2022 | BUILDING - FINAL | TLUNDBERG | Approved | AP |