Permit: T21CM04149
Permit Details
Apply Date:
05/14/2021
Applicant:
Mario Salgado/ Freedom forever
Description:
Roof top mounted solar installation using : an inverter, solar panels (modules), a utility disconnect, and a production meter
Contractors:
- Freedom forever
Permit Reviews
Permit Number - T21CM04149
Permit Status: Final
Permit Description: Roof top mounted solar installation using : an inverter, solar panels (modules), a utility disconnect, and a production meter
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/14/2021 | OTHER | 06/17/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM04149
Permit Description: Roof top mounted solar installation using : an inverter, solar panels (modules), a utility disconnect, and a production meter
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2021 | TEP CLEARANCE - PM | RCHANDLER | Approved | CODE DGC |
| 06/25/2021 | ELECTRIC - FINAL | RCHANDLER | Approved | |
| 06/25/2021 | BUILDING - FINAL | RCHANDLER | Approved |