Permit: T21CM04018
Permit Details
Status:
Final
Type:
SOLAR WAIVER - RES
Address:
7834 E APPLE TREE DR
Address NEW:
7834 E APPLE TREE DR
Apply Date:
05/11/2021
Applicant:
Titan Solar Power
Description:
INSTALLATION OF A 10.360 kW-DC SYSTEM; MAIN BREAKER DERATE OF 175A
Contractors:
- Titan Solar Power
Permit Reviews
Permit Number - T21CM04018
Permit Status: Final
Permit Description: INSTALLATION OF A 10.360 kW-DC SYSTEM; MAIN BREAKER DERATE OF 175A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/11/2021 | OTHER | 06/16/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM04018
Permit Description: INSTALLATION OF A 10.360 kW-DC SYSTEM; MAIN BREAKER DERATE OF 175A
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2021 | TEP CLEARANCE - PM | RCHANDLER | Approved | CODE DGC |
| 08/20/2021 | ELECTRIC - FINAL | RCHANDLER | Approved | AP DGC clearance for TEP. 8:19: Text informing of arrival soon. 8:21: Call, switched to FaceTime; needs to obtain access, will contact me back. 828: Inspections completed. Jesus will contact me when ready |
| 08/20/2021 | BUILDING - FINAL | RCHANDLER | Approved | AP |